FIRE-Final Inspection | 10/18/2013 | 10/21/2013 | 10/21/2013 | A | PASS |
Forrest France
|
|
|
Verified plan modification and noted C/N items are finished. Life safety passed.
|
BLD-Final | 8/30/2013 | 9/3/2013 | 9/3/2013 | P | PASS |
Dave Hannah
|
|
|
Alex Phone #: ###-####
|
FIRE-Final Inspection | 8/30/2013 | 9/3/2013 | 9/3/2013 | A | PART |
Troy Cobbley
|
|
|
Life safety complete in Building #2, 2104 Front. Exit signs have been installed and hardware removed from the in-active leaf.
|
BLD-Final | 8/27/2013 | 8/28/2013 | 8/29/2013 | P | NR |
Dave Hannah
|
|
|
alex Phone #: ###-####
|
FIRE-Final Inspection | 8/27/2013 | 8/28/2013 | 8/28/2013 | A | FAIL |
Troy Cobbley
|
|
|
Alex only wanted an inspection for Building 2 (1204 Front). TO sign off life safety for this area I need the two exit signs installed (self illuminated) as discussed. I also need, at the Lobby exit, either automatic flush bolts installed or the hardware removed from the inactive leaf. For the doors exiting the warehouse the dead bolt on the active leaf needs to be removed.
|
FIRE-Final Inspection | 7/2/2013 | 7/2/2013 | 7/2/2013 | P | NR |
Forrest France
|
|
|
Final pending remainder of correction items.
|
BLD-Final | 6/26/2013 | 6/27/2013 | 6/28/2013 | P | PEND |
Dave Hannah
|
|
|
Alex Phone #: ###-#### walked building with tenant handrails doorhardware stairs all need work .
|
FIRE-Final Inspection | 6/26/2013 | 6/27/2013 | 6/27/2013 | A | FAIL |
Forrest France
|
|
|
Noted several items in need of correction- refer to annotations on permit documents, need to replace/repair drop ceilings, request electrical inspection, exiting and egress components to meet plan review, items 1-4 are not met.
|