BLD-Final | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | PASS |
Tom Arcoraci
|
|
|
Jake-Please call at least 30 mins prior to inspection Phone #: ###-####
|
DOC - Permit Finaled | 12/9/2013 | 12/9/2013 | 12/9/2013 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 12/6/2013 | 12/6/2013 | 12/6/2013 | P | PART |
Tom Arcoraci
|
|
|
Jake Phone #: ###-#### needs vert bar in bath room
|
FIRE-Final Inspection | 12/5/2013 | 12/6/2013 | 12/6/2013 | A | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
FIRE-Final Inspection | 10/16/2013 | 10/17/2013 | 10/17/2013 | A | PART |
Forrest France
|
|
|
Per contractor, plan modifications are pending to include a second relocation of starbucks. Remainder of demo work and new work in the pharmacy passed life safety inspection.
|
FIRE-Final Inspection | 10/11/2013 | 10/14/2013 | 10/14/2013 | A | NR |
Forrest France
|
|
|
Project related fire sprinkler permit must be finaled prior to building fire life safety approval.
|
BLD-Ceiling Grid Inspection | 8/19/2013 | 8/20/2013 | 8/20/2013 | A | PASS |
Tom Arcoraci
|
|
|
mike Phone #: ###-####
|
BLD-Framing/Rough-in | 7/29/2013 | 7/29/2013 | 7/29/2013 | P | PART |
Tom Arcoraci
|
|
|
Late afternoon - Mike ###-#### wip ok at pharmacy new
|