Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD13-01745
StatusFinaled
Name HC COMPANY INC
Site Address 11331 W CHINDEN BLVD
Project NameMAXIMUS
Customer Number 
ePlanReviewYes
Description
(MAXIMUS – HP Bldg # 8 – Entire Building) This building is fully fire sprinklered for area increase. Permit is to remodel an entire 168,000 square foot three story call center for a new call center tenant; majority of all work limited to the first floor. Work is to include: [construction of interior none bearing walls to create; 14 large training rooms, a café area, a large break room, a pantry, a vendor area, a large open office area, 13 new private offices, 3 conference rooms, and a new telecom room], installation of a new lighting, installation of new plumbing, installation of new mechanical, and new interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/11/20139/12/20139/11/2013APASS
DetailsJim Sly
Jason Phone #: ###-####
Structural final Pass.
FIRE-Final Inspection9/11/20139/11/20139/11/2013PPASS
DetailsTroy Cobbley
Life safety passed
BLD-Final8/30/20139/3/20139/3/2013APART
DetailsMike Jordan
for temp occ for north side of building//jason Phone #: ###-####. ok for temp occ. on 1st. floor nortside traininf rooms only.
FIRE-Final Inspection8/30/20139/3/20139/3/2013APART
DetailsTroy Cobbley
A temp occ for north side of building first floor is approved with scotts permission. See tide mark entry for conditions/exiting. Emergency lighting on the second and third floors was verified.
FIRE-Final Inspection8/30/20138/30/20138/30/2013PFAIL
DetailsTroy Cobbley
Provide one additional emergency light in the corridor as marked on the city approved plans and provide the missing double sided exit sign at this same corridor. Also repair all emergency lighting as marked on the plans and all of the emergency lighting in the existing/to remain area. The photo cells on the exit discharge lights need to be addressed as discussed.
BLD-Ceiling Grid Inspection8/16/20138/16/20138/16/2013PPASS
DetailsJim Sly
JASON Phone #: ###-####
BLD-Framing/Rough-in7/23/20137/23/20137/23/2013PPASS
DetailsJim Sly
Jason Phone #: ###-####
BLD-Framing/Rough-in7/18/20137/19/20137/19/2013ANR
DetailsJim Storey
Jason Phone #: ###-#### no trade permits grouped to 2 bld permit no insp. until trade permits are addressed/ ele was failled am