Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberBLD13-01769
StatusFinaled
Name STOTT GARY B
Site Address 802 N BACON DR
Project Name 
Customer Number 
ePlanReviewNo
Description
This project is for the razing of 169s.f. of existing residential slab on grade construction and rebuilding a 91s.f. area of living space; creating a new master bathroom. The project will include the removal of about 30 l.f. of existing foundation wall and replacing same along with the removal of the living room ceiling support wall and replacing with a pre manufactures engineered lumber see...attached. Separate electrical, plumbing, mechanical and ESC permits are required. R-1C ok per Leon Letson. A letter from the applicant’s geotechnical engineer indicating that the footing subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946. All per the approved plans as marked ands the plan review notes. pep
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/2/20168/2/20168/2/2016PPASS
DetailsPhil Shearer
Gary Phone #: ###-####
DOC - Permit Finaled8/2/20168/2/20168/2/2016PPASS
DetailsPhil Shearer
BLD-Final7/28/20167/29/20167/29/2016PCANC
DetailsDave Hannah
Gary Phone #: ###-####
BLD-Energy code compliance6/18/20146/19/20146/19/2014PPASS
DetailsTom Arcoraci
Late afternoon - Gary Phone #: ###-####
BLD-Framing/Rough-in6/13/20146/13/20146/13/2014PPASS
DetailsDave Hannah
Gary Phone #: ###-####
BLD-Conference6/9/20146/10/20146/10/2014ADONE
DetailsDave Hannah
Call at least 30 mins in advance for access-Gary Phone #: ###-####
BLD-Conference9/18/20139/19/20139/19/2013ADONE
DetailsDave Hannah
gary Phone #: ###-#### - call 30 mins prior
BLD-Conference9/18/20139/18/20139/18/2013PDONE
DetailsJim Sly
gary Phone #: ###-####
BLD-Other8/13/20138/14/20138/14/2013APASS
DetailsJim Sly
insulation on foundation /// Gary Phone #: ###-####
BLD-Foundation7/31/20138/1/20138/1/2013APASS
DetailsDave Hannah
stem wall//gary Phone #: ###-####
BLD-Footing7/29/20137/30/20137/30/2013PPASS
DetailsDave Hannah
earl pm//Gary Phone #: ###-####