FIRE-Final Inspection | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | PASS |
Forrest France
|
|
|
Fire life safety inspection passed after corrections and adjustments made while on site.
|
BLD-Final | 2/10/2014 | 2/11/2014 | 2/11/2014 | A | PASS |
Dave Hannah
|
|
|
Final inspection request of H&H 16th Floor. Adam will walk with you for this inspection. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Conference | 2/4/2014 | 2/5/2014 | 2/5/2014 | A | PEND |
Dave Hannah
|
|
|
Meet and walk H&H floors for egress signage compliance. Contact Adam or Murph. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Ceiling Grid Inspection | 1/17/2014 | 1/21/2014 | 1/21/2014 | P | PART |
Jim Sly
|
|
|
Ceiling inspection, 16th floor Holland and Hart. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson Install Perimeter only.....OK.
|
BLD-Ceiling Grid Inspection | 1/7/2014 | 1/8/2014 | 1/9/2014 | P | PART |
Dave Hannah
|
|
|
Ceiling grid inspection requested by Murph, PM, 16th Floor H&H. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to place bourder tiles in
|
BLD-Ceiling Grid Inspection | 12/27/2013 | 12/30/2013 | 12/31/2013 | P | PART |
Dave Hannah
|
|
|
Ceiling inspection, 16th Floor Holland and Hart, requested for PM Monday, by Murph. Thanks, AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson hard lids both sides of elevator lobby ok to cover
|
BLD-Framing/Rough-in | 10/31/2013 | 10/31/2013 | 11/1/2013 | P | PASS |
Dave Hannah
|
|
|
Framing inspection request from John Woods. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 10/30/2013 | 10/30/2013 | 10/31/2013 | P | PART |
Dave Hannah
|
|
|
Requested inspection of 16th Floor East, coordinate specific needs with Murph, ESI, ###-####. Thank you. Adam ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover all but break room wall
|
BLD-Framing/Rough-in | 10/24/2013 | 10/24/2013 | 10/24/2013 | A | PART |
Dave Hannah
|
|
|
Inspection scheduled via John Woods. Adam is off site this morning, contact John for inspection needs. Thanks. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover rooms 1627-34 1601-10 1652-56
|
BLD-Framing/Rough-in | 10/1/2013 | 10/1/2013 | 10/3/2013 | P | PART |
Dave Hannah
|
|
|
H&H 16th Floor Framing. Thanks. Adam Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to cover rooms 1###-#### and rooms 1###-####
|