Information based on query as of Tuesday, June 25, 2024.
Permit Information
Permit NumberBLD13-01918
StatusFinaled
Name HJ MARTIN & SONS INC
Site Address 300 N MILWAUKEE ST
Project NameJCPENNEY SEPHORA
Customer Number 
ePlanReviewNo
Description
(JCPENNEY – Sephora – 1st floor) This building is fire sprinklered for area increase. Permit is to remodel 3,297 square foot of an existing JCPenny retail anchor store (1st floor). Work is to include: construction of a new partition wall, some new lighting, and interior finishes. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. Note: installation of new racking that exceeds 8 ft in height will require a separate “Racking Permit” be submitted and approved prior to installation. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/29/201512/30/201512/30/2015APASS
DetailsDave Hannah
Brenda Phone #: ###-####
DOC - Permit Finaled12/30/201512/30/201512/30/2015PPASS
DetailsDave Hannah
FIRE-Final Inspection10/24/201310/25/201310/25/2013APASS
DetailsCraig D. Hanson
device installed and functining
FIRE-Final Inspection10/23/201310/24/201310/24/2013PFAIL
DetailsTroy Cobbley
Strobe still has not been corrected yet.
FIRE-Final Inspection10/22/201310/23/201310/23/2013AFAIL
DetailsTroy Cobbley
I made multiple trips to this job site today but the fire alarm audio/visual device is still an issue.
FIRE-Final Inspection10/18/201310/18/201310/18/2013PPART
DetailsTroy Cobbley
With the Buiding Official and Fire Marshals permission a temporary occupancy is being granted with the following condition: An approved fire watch will be posted until the existing fire alarm system is extended into the remodeled space, the two exit signs are installed and tested and emergency lighting is verified and the sprinkler head in the Dressing Room is relocated. Ext 200 or page her-Theresa Taylor Phone #: ###-####
BLD-Conference10/17/201310/17/201310/17/2013PNR
DetailsMike Jordan
Teresa will need to dial 9 then ext 200 Phone #: ###-####
BLD-Framing/Rough-in8/16/20138/16/20138/16/2013PPASS
DetailsJim Sly
Troy-PLease call prior to inspection Phone #: ###-####