BLD-Final | 4/30/2014 | 4/30/2014 | 4/30/2014 | P | PASS |
Jim Storey
|
|
|
|
BLD-Final | 3/4/2014 | 3/5/2014 | 3/10/2014 | A | PART |
Jim Storey
|
|
|
julio-Please call at least 30 mins prior to inspection Phone #: ###-#### pending pw
|
FIRE-Final Inspection | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | PASS |
Forrest France
|
|
|
Final fire life safety inspection passed.
|
FIRE-Final Inspection | 2/20/2014 | 2/21/2014 | 2/21/2014 | P | PART |
Forrest France
|
|
|
Final pending paving/site access. Remainder of fire life safety passed.
|
BLD-Ceiling Grid Inspection | 2/18/2014 | 2/18/2014 | 2/18/2014 | P | PASS |
Jim Storey
|
|
|
julio Phone #: ###-#### ( this has nothing to do with the plan mod)
|
FIRE-Conference | 1/28/2014 | 1/28/2014 | 1/29/2014 | P | DONE |
Forrest France
|
|
|
On site conference with contractor regarding exit signs, plan modification, project schedule, etc.
|
FIRE-Conference | 1/28/2014 | 1/28/2014 | 1/28/2014 | P | DONE |
Forrest France
|
|
|
|
BLD-Conference | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | PASS |
Jim Storey
|
|
|
julio Phone #: ###-####
|
BLD-Footing | 9/4/2013 | 9/5/2013 | 9/5/2013 | A | PART |
Tom Arcoraci
|
|
|
julio - calll prior Phone #: ###-#### pending spec inspection
|
BLD-Footing | 8/28/2013 | 8/29/2013 | 8/29/2013 | A | PASS |
Jim Storey
|
|
|
julio Phone #: ###-#### north exterior ft ok
|
BLD-Footing | 8/27/2013 | 8/28/2013 | 8/28/2013 | P | CANC |
Jim Storey
|
|
|
julio Phone #: ###-####
|
BLD-Footing | 8/27/2013 | 8/27/2013 | 8/27/2013 | P | PASS |
Jim Storey
|
|
|
Julio Phone #: ###-#### rebar ok pending si report.
|