BLD-Final | 11/14/2013 | 11/14/2013 | 11/14/2013 | P | PASS |
Jim Storey
|
|
|
paul Phone #: ###-####
|
DOC - Permit Finaled | 11/14/2013 | 11/14/2013 | 11/14/2013 | P | PASS |
Jim Storey
|
|
|
|
BLD-Framing/Rough-in | 8/30/2013 | 8/30/2013 | 9/4/2013 | P | PASS |
Jim Sly
|
|
|
paul Phone #: ###-#### Energy ....OK
|
BLD-Energy code compliance | 8/28/2013 | 8/29/2013 | 8/29/2013 | A | NR |
Jim Storey
|
|
|
paul after 9 am if possible Phone #: ###-####
|
BLD-Framing/Rough-in | 8/29/2013 | 8/29/2013 | 8/29/2013 | A | PASS |
Jim Storey
|
|
|
paul after 9 am if possible Phone #: ###-####
|
BLD-Framing/Rough-in | 8/7/2013 | 8/7/2013 | 8/7/2013 | P | PART |
Jim Storey
|
|
|
paul Phone #: ###-#### - call 30 mins prior framing ok pending other trades aprovals/ ok to insulate
|