Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-02052
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8786 W PINE NUT LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1682 sq. ft., two story (first story 731 sq. ft., second story 951 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 45 sq. ft. of covered patio/porch and a 439 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final5/1/20145/2/20145/2/2014APASS
DetailsMike Jordan
Please inspect between 9-10 am. Please call Brian 30 minutes prior to inspection. Phone #: ###-#### >> Inspection requested via web by Brian Stark
DOC - Permit Finaled5/2/20145/2/20145/2/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results5/2/20145/2/20145/2/2014ADONE
DetailsMike Jordan
4.0
BLD-Wall cover2/27/20142/27/20142/27/2014PPASS
DetailsMike Jordan
Shear and firewall nailing Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in2/21/20142/21/20142/21/2014PCANC
DetailsMike Jordan
Call brian prior Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Energy code compliance2/21/20142/21/20142/21/2014PPASS
DetailsMike Jordan
Call brian prior Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in2/13/20142/14/20142/14/2014PPASS
DetailsMike Jordan
Call brian prior to inspection Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall Bracing12/2/201312/2/201312/2/2013PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall Bracing11/16/201311/18/201311/18/2013AFAIL
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Nail off the double portal frame at 3 inches on center, Provide the floor to floor straps and nail off all missed areas.
BLD-Wall Bracing11/5/201311/5/201311/5/2013PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Footing9/11/20139/12/20139/12/2013PPART
DetailsJim Sly
Greg Phone #: ###-#### slab
BLD-Footing8/30/20138/30/20138/30/2013PCANC
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Inspection cancelled via mobile web on Friday, August 30, 2013.
BLD-Foundation8/30/20139/3/20138/30/2013PCANC
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron Inspection cancelled via mobile web on Friday, August 30, 2013.
BLD-Energy code compliance8/29/20138/29/20138/29/2013PPASS
DetailsMike Jordan
greg Phone #: ###-####. Rigid insulation at stemwall under slab on grade.
BLD-Foundation8/26/20138/27/20138/27/2013PPASS
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
BLD-Footing8/27/20138/27/20138/27/2013PPART
DetailsMike Jordan
Phone #: 2086971241 >> Inspection requested via mobile web by Heron. Footing was inspected yesterday, the wrong permit number was called in.
BLD-Conference8/21/20138/21/20138/21/2013ACANC
DetailsMike Jordan
ESC Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Conference8/21/20138/21/20138/21/2013ADONE
DetailsMike Jordan
ESC Phone #: ###-#### >> Inspection requested via web by James Larkin