BLD-Final | 8/5/2015 | 8/6/2015 | 8/6/2015 | A | PASS |
Dave Hannah
|
|
|
Shane Phone #: ###-####
|
DOC - Permit Finaled | 8/6/2015 | 8/6/2015 | 8/6/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 7/30/2015 | 7/31/2015 | 7/31/2015 | A | NR |
Dave Hannah
|
|
|
Shane Phone #: ###-#### needs zoning final
|
BLD-Energy code compliance | 1/8/2014 | 1/13/2014 | 1/14/2014 | P | PASS |
Dave Hannah
|
|
|
Shane Phone #: ###-####
|
BLD-Framing/Rough-in | 12/31/2013 | 12/31/2013 | 12/31/2013 | P | PART |
Jim Storey
|
|
|
Shane Phone #: ###-#### ok to insulate and gyp p/l wall
|
BLD-Framing/Rough-in | 9/20/2013 | 9/25/2013 | 9/25/2013 | A | PART |
Mike Jordan
|
|
|
Shane Phone #: ###-####. Verified 5/8 type x rock on west wall. Needs to add blocking for wall bracing at corners. ok to cover exterior wall.
|