FIRE-Final Inspection | 12/19/2013 | 12/19/2013 | 12/20/2013 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|
BLD-Final | 9/25/2013 | 9/26/2013 | 9/27/2013 | A | DONE |
Dave Hannah
|
|
|
Ashley Phone #: ###-####
|
BLD-Final | 9/26/2013 | 9/27/2013 | 9/27/2013 | P | PASS |
Dave Hannah
|
|
|
Ashley please call before going out Phone #: ###-####
|
FIRE-Final Inspection | 9/26/2013 | 9/27/2013 | 9/27/2013 | A | PART |
Forrest France
|
|
|
Ashley please call before going out Phone #: ###-#### Okayed for Temp per conditions discussed with tenant and R. Gervais pending project related fire alarm permit work.
|
FIRE-Final Inspection | 9/25/2013 | 9/26/2013 | 9/26/2013 | A | FAIL |
Craig D. Hanson
|
|
|
Hood needs to be conected to Alarm system. No notification devices in space are required
|
BLD-Final | 9/25/2013 | 9/25/2013 | 9/25/2013 | P | NR |
Mike Jordan
|
|
|
ashley Phone #: ###-####. Needs plumbing final and life/safety failed.
|
FIRE-Final Inspection | 9/24/2013 | 9/25/2013 | 9/25/2013 | P | FAIL |
Forrest France
|
|
|
Missing approved plans, review comments, permit documents on site. Provide directional indicator at the second exit sign, a fire alarm permit may be required for new cooking appliances.
|
BLD-Framing/Rough-in | 9/12/2013 | 9/13/2013 | 9/13/2013 | A | PASS |
Dave Hannah
|
|
|
Nate Phone #: ###-####
|