BLD-Final | 10/23/2013 | 10/24/2013 | 10/24/2013 | A | PASS |
Mike Jordan
|
|
|
Lyle-Please call regarding access Phone #: ###-####
|
DOC - Permit Finaled | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | PASS |
Mike Jordan
|
|
|
Per contractor, no plumbing or mechanical upgrades or replacement at this time. No evidence of this work at this point in time. Ekectrical has been finaled.
|
BLD-Final | 10/23/2013 | 10/23/2013 | 10/23/2013 | P | FAIL |
Mike Jordan
|
|
|
Lyle Phone #: ###-####. Provide battery power smoke detector in downstairs bedroom.
|
BLD-Energy code compliance | 9/24/2013 | 9/25/2013 | 9/25/2013 | P | PASS |
Mike Jordan
|
|
|
framing also - Lyle Phone #: ###-####. Additional smoke detectors were added. ok to cover.
|
BLD-Framing/Rough-in | 9/23/2013 | 9/23/2013 | 9/23/2013 | P | PART |
Mike Jordan
|
|
|
lyle Phone #: ###-####. Framing ok. Needs to provide additional smoke detectors in downstairsbedrooms were sheetrock has been removed, hardwired and interconnected. P rovide additional smoke detector or combo CO in hallway outside downstairs bedrooms, hardwired and interconnected if possible. Provide battery opreated smoke dtectors in remaining bedrooms. ok to insulate.
|
BLD-Framing/Rough-in | 9/17/2013 | 9/18/2013 | 9/18/2013 | A | NR |
Mike Jordan
|
|
|
Phone #: ###-####. Electrical rough in inspection has failed. Need to inquire about plumbing and mechanical?
|
BLD-Wall Bracing | 9/11/2013 | 9/11/2013 | 9/11/2013 | P | PASS |
Mike Jordan
|
|
|
lee Phone #: ###-####
|