BLD-Final | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | PASS |
Jim Sly
|
|
|
Austin Phone #: ###-####
|
DOC - Permit Finaled | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Blower Door Test Results | 1/9/2014 | 1/9/2014 | 1/9/2014 | P | PASS |
Jim Sly
|
|
|
3.9
|
BLD-Energy code compliance | 10/28/2013 | 10/28/2013 | 10/28/2013 | P | PASS |
Jim Sly
|
|
|
Rollo Phone #: ###-####
|
BLD-Energy code compliance | 10/25/2013 | 10/28/2013 | 10/28/2013 | A | NR |
Jim Sly
|
|
|
Rollo Phone #: ###-#### Corrections not completed. Left C/N.
|
BLD-Framing/Rough-in | 10/24/2013 | 10/25/2013 | 10/25/2013 | A | PART |
Dave Hannah
|
|
|
Rollo Phone #: ###-#### c/n on site ok to insulate
|
BLD-Framing/Rough-in | 10/24/2013 | 10/24/2013 | 10/24/2013 | P | NR |
Dave Hannah
|
|
|
Rollo Phone #: ###-####
|
BLD-Wall Bracing | 10/14/2013 | 10/15/2013 | 10/15/2013 | A | PASS |
Jim Sly
|
|
|
rollo Phone #: ###-####
|
BLD-Wall Bracing | 10/8/2013 | 10/9/2013 | 10/9/2013 | A | FAIL |
Dave Hannah
|
|
|
rollo Phone #: ###-#### needs a stapel equv for shear plans call for nails
|
BLD-Foundation | 9/16/2013 | 9/18/2013 | 9/18/2013 | P | PASS |
Jim Sly
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron
|
BLD-Footing | 9/16/2013 | 9/17/2013 | 9/17/2013 | P | PART |
Tom Arcoraci
|
|
|
Phone #: 2086971241 >> Inspection requested via mobile web by Heron wip
|