Permit Information
Permit NumberBLD13-02425
StatusFinaled
Name MCALVAIN CONSTRUCTION INC
Site Address 1004 W ROYAL BLVD
Project NameRIVER EDGE APARTMENTS
Customer Number 
ePlanReviewNo
Description
(RIVER EDGE APARTMENTS - EAST WING) (x-ref expired permit BLD12-00319) The east wing consists of four floors of 32, 940 sq. ft. each, a total area of 131,760 sq. ft. with (91) dwelling units [(23)-2BR apartments (5 on 2nd floor / 6 on floors 3, 4 & 5 ) and (68) - 4BR apartments (17 per floor)]. All 2-BR units exceed 800 Sq. ft. in area and all 4-BR units exceed 1,100 sq. ft. in area. The east and west wings of the residential floors are divided by a 2-hour fire wall / horizontal exit assembly, extending from the top of 3-hour concrete floor to the underside of the roof deck sheathing, with fire retardant plywood deck extending 4 feet on each side of fire wall in place of a parapet. The dwelling units are separated from the parking area on the 1st level by a 3-hour fire-resistive horizontal floor/ceiling assembly. This allows the parking garage and the residential units above to each be considered as a separate building for code compliance. drs DRH12-00013 CUP11-00090 CFH11-00036
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/20/201510/20/201510/20/2015APASS
DetailsJim Storey
perm occ ok
BLD-Final8/26/20158/27/20158/27/2015APASS
DetailsJim Storey
Level 5 inspection for Temp C of O, all other inspections are complete. Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Final8/24/20158/25/20158/25/2015PNR
DetailsJim Storey
Level 5 final for C of O Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Final8/18/20158/19/20158/19/2015APASS
DetailsJim Storey
Final walk on rooms 360, 460,, 356, 456, 350, 450 at 10 am Phone #: ###-#### Inspection requested via web by Mike Wilson pending 5th floor as directed.
BLD-Final8/17/20158/18/20158/18/2015PNR
DetailsJim Storey
finish the building walk on items to complete for Temp sign off 1 pm Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Ceiling Grid Inspection8/6/20158/7/20158/7/2015APASS
DetailsJim Storey
Fire caulking inspection on level 2 South elevator lobby, level 3 Center lobby and level 4 Center lobby Phone #: ###-#### Inspection requested via web by Mike Wilson
FIRE-Final Inspection8/4/20158/4/20158/4/2015PPASS
DetailsThomas Walsh
Fire life safety inspection of new apartment building, including test of exit signs and emergency lighting units throughout the building. Several EM lights need to be repaired/replaced. Also need additionl exit signs in south corridor (all floors) to clearly indicate the direction of egress to the southeast exit stair.
EVAC plans need to be installed.
Fire Exting. OK
****AS PER sja FINAL PASSED****
BLD-Wall cover7/31/20157/31/20157/31/2015PPART
DetailsJim Sly
level 5 fire caulking in the drop ceiling area around sprinkler pipe Phone #: ###-#### Inspection requested via web by Mike Wilson
OK
BLD-Ceiling Grid Inspection7/28/20157/29/20157/29/2015APASS
DetailsJim Storey
Level 2 and 3 hallway inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Ceiling Grid Inspection7/27/20157/28/20157/28/2015PPART
DetailsJim Storey
Level 2 and 3 hallway inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson firestopping required
FIRE-Conference7/15/20157/15/20157/15/2015PDONE
DetailsThomas Walsh
Meeting to discuss corridor ceiling heights in several areas, including the provisions needed for exposing CPVC sprinkler pipe and the location of exit signage below drop ceilings in these corridors, including code requirements for min. ceiling heights below the drop ceiling. Meeting notes suggested that the CVPC pipe will probably be made to be concealed, but that some steel dry pipe system piping may be exposed in some areas. Exit signs may have to be offset from plan locations, but this should acceptable if they meet the min. celing heights as per Bldg Code. and clearly show the direction of exit travel. If CVPC pipe has to run exposed, the sprinkler contractor (Shilo) was informed that this will take a plan modification submittal to the plan checker to ensure that this meets manufacturer's specifications.
BLD-Wall cover7/3/20157/6/20157/6/2015APART
DetailsJim Storey
Level 5 shafts fire caulking inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson corridor ok / shafts ok per list.
BLD-Wall cover7/1/20157/1/20157/1/2015PPART
DetailsJim Storey
10 shaft on level 5 for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Wall cover6/25/20156/26/20156/26/2015PNR
DetailsJim Storey
level 5 shafts for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance6/10/20156/11/20156/12/2015PPASS
DetailsDave Hannah
Level 5 East perimeter wall energy code Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance6/1/20156/3/20156/3/2015PPASS
DetailsJim Storey
level 4 East Perimeter wall energy code Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Framing/Rough-in5/21/20155/22/20155/22/2015APASS
DetailsJim Storey
Level 4 East unit framing and stair well A for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance5/12/20155/13/20155/13/2015PPASS
DetailsJim Storey
Level 3 East exterior wall foam and insulation inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Wall cover5/11/20155/12/20155/12/2015APASS
DetailsJim Storey
The rest of units on level 2 east drop down ceiling fire caulking inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Wall cover5/5/20155/6/20155/6/2015PPASS
DetailsJim Storey
Level 2 East drop ceiling framing in units for cover, level 3 East wood framing unit framing for cover Inspection requested via web by Mike Wilson drops ok pending fire as noted/ 303 and 304 beam support justafacation. all the rest of framing ok.
BLD-Framing/Rough-in4/28/20154/29/20154/29/2015PPASS
DetailsJim Storey
Elevator #1 shaft framing for cover, South elevation shear nailing Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance4/22/20154/23/20154/23/2015APASS
DetailsJim Storey
level 2 shower pan grouting in PT deck, Exterior insulation in perimeter walls Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Energy code compliance4/20/20154/21/20154/21/2015APASS
DetailsJim Storey
Level 2 East exterior wall inspection for drywall Phone #: ###-#### Inspection requested via web by Mike Wilson up to 214 ok/ 4th floor coridor ok to pre gyp
BLD-Framing/Rough-in4/20/20154/21/20154/21/2015APART
DetailsJim Storey
Elevator shaft #2 framing inspection for drywall cover Phone #: ###-#### Inspection requested via web by Mike Wilson all but east/north corner gyp. missing
BLD-Framing/Rough-in4/14/20154/14/20154/14/2015PPASS
DetailsJim Storey
roof deck nw andne ok 2nd floor rooms framing ok212 thur 221
BLD-Framing/Rough-in4/9/20154/10/20154/10/2015PPASS
DetailsJim Storey
Level 2 East unit 207 to 212 ceilings for Drywall cover, Level 2 east exterior wall sealant, East exterior elevation sheathing nail inspection. Roof Truss engineering Phone #: ###-#### Inspection requested via web by Mike Wilson east truss ok/ east wall exterior ok/
BLD-Framing/Rough-in4/7/20154/8/20154/8/2015PCANC
DetailsJim Storey
Next 6 unit ceiling framing for cover, Level 2 exterior wall envelope, East exterior Nailing inspection, Phone #: ###-#### >> Inspection requested via web by Mike Wilson Inspection cancelled from web by: Mike Wilson
BLD-Framing/Rough-in4/2/20154/3/20154/3/2015PPASS
DetailsJim Storey
First 6 Units Ceiling inspections for Insulation inspection East Wing Phone #: ###-#### Inspection requested via web by Mike Wilson 2nd floor 202 thru 207 frame ok ok to insulate.
BLD-Framing/Rough-in3/30/20153/31/20153/31/2015PPASS
DetailsJim Storey
More East side Roof nailing and Level 4 corridor framing inspection for cover Phone #: ###-#### Inspection requested via web by Mike Wilson
BLD-Framing/Rough-in3/19/20153/20/20153/20/2015PPASS
DetailsJim Storey
Northeast exterior building nailing for building wrap install, East Roof nailing inspection for Roofing install Phone #: ###-#### Inspection requested via web by Mike Wilson k line wall and roof ok to cover
BLD-Wall cover2/25/20152/26/20152/26/2015APASS
DetailsJim Storey
Level 2 east hallway wall inspection and Exterior sheathing nailing inspection at the CMU wall only Phone #: ###-#### Inspection requested via web by Mike Wilson ok to pre rock corridor at ceilling and 24 inches down walls