BLD-Final | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | PASS |
Jim Sly
|
|
|
Jason Phone #: ###-#### Verbal from Daryl D. that Electr. final...OK
|
DOC - Permit Finaled | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | PASS |
Jim Sly
|
|
|
|
FIRE-Final Inspection | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Framing/Rough-in | 10/3/2013 | 10/3/2013 | 10/3/2013 | P | PASS |
Jim Sly
|
|
|
Jeff phone Framing at dock area.
|
BLD-Framing/Rough-in | 10/2/2013 | 10/3/2013 | 10/3/2013 | A | CANC |
Jim Sly
|
|
|
Requesting framing inspection of B2L locker rooms. Please call Jeff Tonkin prior to arrival on site. Phone #: ###-#### >> Inspection requested via web by Jeff Tonkin
|
BLD-Framing/Rough-in | 9/24/2013 | 9/25/2013 | 9/25/2013 | A | PART |
Jim Sly
|
|
|
Jason Phone #: ###-#### Main level Restroom framing OK except for shower areas.
|