DOC - Permit Expired | 5/13/2019 | 5/13/2019 | 5/13/2019 | P | PASS |
Jim Storey
|
|
|
ncfi
|
BLD-Framing/Rough-in | 5/14/2014 | 5/14/2014 | 5/14/2014 | P | NR |
Tom Arcoraci
|
|
|
Jay Phone #: ###-#### needs plumbing and elec ok to cover
|
BLD-Footing | 3/31/2014 | 3/31/2014 | 3/31/2014 | P | PASS |
Tom Arcoraci
|
|
|
jay Phone #: ###-####
|
BLD-Foundation | 3/24/2014 | 3/24/2014 | 3/24/2014 | P | NR |
Tom Arcoraci
|
|
|
Shirley- Phone #: ###-####
|
BLD-Conference | 1/14/2014 | 1/14/2014 | 1/14/2014 | P | NR |
Jim Sly
|
|
|
SHIRLEY PLEASE CALL BEFORE GOING OUT Phone #: ###-#### Called.....Left V/M No return call. Went to jobsite. Tom Requested Electr and Plumbing permits and rough-in inspections......Not done. Dig around structure to expose footing........Dig down 10 inches in 2 places. Need to dig down further. Do not tyvek Exterior until shear inspection completed. Need to fasten all shear panels per code. Relayed all this info to workers on site.
|
BLD-Conference | 12/16/2013 | 12/17/2013 | 12/17/2013 | A | PART |
Tom Arcoraci
|
|
|
needs to expose foundation for inspection
|
BLD-Conference | 12/16/2013 | 12/17/2013 | 12/16/2013 | A | CANC |
Tom Arcoraci
|
|
|
Shirley Phone #: ###-####
|
BLD-Framing/Rough-in | 10/21/2013 | 10/22/2013 | 10/22/2013 | A | FAIL |
Tom Arcoraci
|
|
|
Jamie Phone #: ###-#### plumbing permit required if plunbing to be used electric permit required for elec wireing,removal of garage door must have plan review approval and footing /foundation must be exposed for inspection of frost depth and width
|