Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD13-02647
StatusFinaled
Name TAHOE HOMES LLC
Site Address 5778 E MILLET DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2,436 sq. ft., two story (first story 1,106 sq. ft., second story 1,330 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 112 sq. ft. of covered patio/porch and a 629 sq. ft. attached garage per the approved plans, plan review report and any notations. R-1C zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final10/3/201410/7/201410/7/2014APASS
DetailsJim Storey
Clint Phone #: ###-####
DOC - Permit Finaled10/7/201410/7/201410/7/2014PPASS
DetailsJim Storey
BLD-Blower Door Test Results10/7/201410/7/201410/7/2014ADONE
DetailsJim Storey
418Clint Phone #: ###-####
BLD-Final10/2/201410/3/201410/3/2014ANR
DetailsPhil Shearer
BLD-Energy code compliance8/4/20148/5/20148/5/2014APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Framing/Rough-in7/31/20148/1/20148/1/2014APASS
DetailsPhil Shearer
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD-Other7/29/20147/30/20147/30/2014APASS
DetailsPhil Shearer
Fire rated soffit - Clint Phone #: ###-####
BLD-Wall Bracing7/14/20147/14/20147/14/2014PPASS
DetailsPhil Shearer
joey Phone #: ###-####
BLD-Foundation5/20/20145/22/20145/22/2014PPASS
DetailsJim Storey
Wes-pour time 3:00 Phone #: ###-####
BLD-Footing5/21/20145/21/20145/21/2014PPASS
DetailsDave Hannah
Wes-pour time 3:30-4:00 Phone #: ###-####
BLD-Footing5/20/20145/21/20145/21/2014ANR
DetailsDave Hannah
Wes-pour time 3:30-4:00 Phone #: ###-####
BLD-Foundation5/16/20145/20/20145/20/2014PCANC
DetailsDave Hannah
Wes Phone #: ###-#### (as per contractor wants to cancel inspection)
BLD-Footing5/16/20145/19/20145/19/2014PCANC
DetailsDave Hannah
Wes Phone #: ###-####