BLD-Final | 2/24/2014 | 2/25/2014 | 2/25/2014 | P | PASS |
Tom Arcoraci
|
|
|
Sarah Dupree Phone #: ###-####
|
BLD-Final | 11/25/2013 | 11/25/2013 | 11/25/2013 | P | CANC |
Mike Jordan
|
|
|
Wes Manz Phone #: ###-####
|
BLD-Final | 11/22/2013 | 11/25/2013 | 11/25/2013 | A | FAIL |
Mike Jordan
|
|
|
Daniel Phone #: ###-####. ADA components not installed within code compliant tolerances.
|
BLD-Final | 11/20/2013 | 11/22/2013 | 11/22/2013 | P | PART |
Mike Jordan
|
|
|
Wes Manz Phone #: ###-####. Ok for temp occ. Needs to install grab bars, mirrors and provide ada compliant dorr hardware on mens restroom.
|
FIRE-Final Inspection | 11/21/2013 | 11/21/2013 | 11/21/2013 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
FIRE-Final Inspection | 11/20/2013 | 11/21/2013 | 11/21/2013 | A | FAIL |
Troy Cobbley
|
|
|
relocate the exit sign/emergency light and the fire extinguishers as discussed and provide occupant load sign.
|
BLD-Energy code compliance | 11/7/2013 | 11/7/2013 | 11/7/2013 | P | PASS |
Mike Jordan
|
|
|
wes Phone #: ###-####. fireblocking completed. ok to cover.
|
BLD-Framing/Rough-in | 11/6/2013 | 11/7/2013 | 11/7/2013 | A | PART |
Mike Jordan
|
|
|
Wes Phone #: ###-####. needs to fireblock at furdowns.
|
BLD-Framing/Rough-in | 11/4/2013 | 11/4/2013 | 11/4/2013 | P | NR |
Mike Jordan
|
|
|
Wes Phone #: ###-####. Needs other trades rough in minspections first.
|
BLD-Conference | 10/30/2013 | 10/30/2013 | 10/30/2013 | P | DONE |
Mike Jordan
|
|
|
WES PLEASE CALL BEFORE GOING OUT Phone #: ###-####
|