BLD-Final | 8/29/2014 | 9/2/2014 | 9/2/2014 | A | PASS |
Phil Shearer
|
|
|
Clint Phone #: ###-####
|
DOC - Permit Finaled | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Blower Door Test Results | 9/2/2014 | 9/2/2014 | 9/2/2014 | P | PASS |
Phil Shearer
|
|
|
4.5
|
BLD-Energy code compliance | 6/30/2014 | 7/1/2014 | 7/1/2014 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Clint Wall
|
BLD-Framing/Rough-in | 6/24/2014 | 6/27/2014 | 6/27/2014 | A | PASS |
Mike Jordan
|
|
|
Phone #: ###-#### Inspection requested via web by Clint Wall. ok to insulate.
|
BLD-Wall Bracing | 6/5/2014 | 6/6/2014 | 6/6/2014 | A | PASS |
Dave Hannah
|
|
|
Rudy Phone #: ###-####
|
BLD-Foundation | 1/17/2014 | 1/17/2014 | 1/17/2014 | P | PASS |
Jim Storey
|
|
|
Advardo Phone #: ###-####
|
BLD-Footing | 1/15/2014 | 1/16/2014 | 1/16/2014 | P | PASS |
Jim Storey
|
|
|
Navaro Phone #: ###-####
|
BLD-Foundation | 1/15/2014 | 1/15/2014 | 1/15/2014 | P | CANC |
Jim Storey
|
|
|
miles Phone #: ###-####
|
BLD-Footing | 12/18/2013 | 12/18/2013 | 12/19/2013 | P | CANC |
Dave Hannah
|
|
|
anton Phone #: ###-#### Dave, Anton will call you when he is digging out the frost.
|
BLD-Footing | 12/6/2013 | 12/6/2013 | 12/9/2013 | P | PEND |
Dave Hannah
|
|
|
Ready around 2:00--Thanks Dave Anton says have a good one! Phone #: ###-#### this footing was not poured as of 12/09/13
|
BLD-Footing | 12/5/2013 | 12/5/2013 | 12/5/2013 | P | FAIL |
Dave Hannah
|
|
|
alvaro Phone #: ###-#### avg temps are below 20deg crew is not using any type of heat insulated blankets only .ground temps are below 32deg talked with wes and jake I will not ok this as is they are pouring at thier own risk. failure to meet aci 306 cold weather standerds will need outside testing
|