BLD-Final | 1/23/2014 | 1/23/2014 | 1/23/2014 | P | PASS |
Tom Arcoraci
|
|
|
An Phone #: ###-#### (for temp, possible final)
|
FIRE-Final Inspection | 1/22/2014 | 1/23/2014 | 1/23/2014 | A | PASS |
Troy Cobbley
|
|
|
life safety passed
|
FIRE-Final Inspection | 1/21/2014 | 1/22/2014 | 1/22/2014 | P | FAIL |
Troy Cobbley
|
|
|
See the city approved for the corrections and their locations. They include a blocked sprinkler head, taped sprinkler heads, mount the fire extinguisher, provide exit lights/emergency lights as per the approved plans, provide single action hardware for all doors except the main exit.
|