BLD-Final | 8/7/2014 | 8/8/2014 | 8/8/2014 | P | PART |
Dave Hannah
|
|
|
Call for access code - Justin Phone #: ###-#### note handrails and gaurd railing along with stairs are to code at time of this inspection.
|
DOC - Permit Finaled | 8/8/2014 | 8/8/2014 | 8/8/2014 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Final | 8/5/2014 | 8/6/2014 | 8/6/2014 | P | NR |
Tony Young
|
|
|
call for garage code // Justin Phone #: ###-####,, walk through only,, no hillside needed,, need to make handrails and guard rails per code,, need trades
|
BLD-Energy code compliance | 5/14/2014 | 5/15/2014 | 5/15/2014 | P | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/12/2014 | 5/13/2014 | 5/13/2014 | A | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, ok to insulate,, need temp glass upstairs by door
|
BLD-Framing/Rough-in | 5/7/2014 | 5/9/2014 | 5/9/2014 | A | NR |
Jim Storey
|
|
|
Justin Phone #: ###-####
|
BLD-Other | 5/7/2014 | 5/8/2014 | 5/8/2014 | P | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, soffits,, work in progress,, ok
|
BLD-Other | 5/7/2014 | 5/8/2014 | 5/8/2014 | A | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, soffits,, work in progress
|
BLD-Wall Bracing | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | PASS |
Tony Young
|
|
|
Justin Phone #: ###-####,, exterior shear ok
|
BLD-Framing/Rough-in | 5/6/2014 | 5/6/2014 | 5/6/2014 | P | NR |
Tony Young
|
|
|
Justin Phone #: ###-####,, need trades,, seal,, walk through only,, need some engineer fixes
|
BLD-Wall Bracing | 5/6/2014 | 5/6/2014 | 5/6/2014 | P | PART |
Tony Young
|
|
|
Justin Phone #: ###-####,, exterior most ok,, need to see soffits
|
BLD-Wall Bracing | 5/5/2014 | 5/6/2014 | 5/6/2014 | A | PEND |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Framing/Rough-in | 5/5/2014 | 5/6/2014 | 5/6/2014 | A | PEND |
Tony Young
|
|
|
Justin Phone #: ###-####
|
BLD-Wall Bracing | 4/15/2014 | 4/15/2014 | 4/15/2014 | P | FAIL |
Tony Young
|
|
|
Justin Phone #: ###-####,, correction posted
|
BLD-Foundation | 1/24/2014 | 1/24/2014 | 1/24/2014 | P | PART |
Tony Young
|
|
|
Pat Phone #: ###-####,, retaining wall ,, wip
|
BLD-Footing | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PART |
Jim Sly
|
|
|
Shane Phone #: ###-#### Bsmnt. footings......Advised Contr. (Shane) to double cover footings for 3 days Min,
|