BLD-Final | 9/26/2014 | 10/1/2014 | 10/1/2014 | A | PASS |
Jim Sly
|
|
|
john Phone #: ###-####
|
DOC - Permit Finaled | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | PASS |
Jim Sly
|
|
|
|
BLD-Final | 9/24/2014 | 9/24/2014 | 9/24/2014 | P | NR |
Jim Sly
|
|
|
John// please call before Phone #: ###-#### need f/p final.
|
BLD-Energy code compliance | 1/14/2014 | 1/15/2014 | 1/15/2014 | A | PASS |
Jim Sly
|
|
|
Please call me if there is a problem. we have made all corrections to the framing inspection for your review. FRAME PASS> john Phone #: ###-#### >> Inspection requested via web by John Flaherty
|
BLD-Framing/Rough-in | 1/10/2014 | 1/13/2014 | 1/13/2014 | P | PART |
Jim Sly
|
|
|
I would like to be at the inspection if you could call me at ###-#### when you are on your way. thanks John F C/N posted Phone #: ###-#### >> Inspection requested via web by John Flaherty
|
BLD-Foundation | 11/12/2013 | 11/13/2013 | 11/13/2013 | P | PART |
Jim Sly
|
|
|
john - around 1 if possible Phone #: ###-#### Footing OK.
|