FIRE-Final Inspection | 11/12/2013 | 11/13/2013 | 11/13/2013 | A | PASS |
Craig D. Hanson
|
|
|
|
BLD-Final | 11/12/2013 | 11/13/2013 | 11/13/2013 | P | PASS |
Jim Storey
|
|
|
dave Phone #: ###-####
|
BLD-Final | 11/6/2013 | 11/8/2013 | 11/8/2013 | A | FAIL |
Jim Storey
|
|
|
Please call ahead for access - David Phone #: ###-#### single function exit hardware/ keyed deadbolts w/ sinage/ landing at door office same as office floor elavation.
|
FIRE-Final Inspection | 11/6/2013 | 11/7/2013 | 11/7/2013 | A | FAIL |
Forrest France
|
|
|
Post building address numbers, lower height of posted PFE's to no higher than 48" AFF, provide signage at the main entry/exit per plan review conditions, storage array to meet guidelines per IFC as indicated and discussed. Site work including paving with FD access not yet complete.
|