BLD-Final | 3/13/2014 | 3/14/2014 | 3/14/2014 | A | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner
|
BLD-Blower Door Test Results | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner 3.8
|
DOC - Permit Finaled | 3/14/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Tom Arcoraci
|
|
|
|
BLD-Final | 3/9/2014 | 3/10/2014 | 3/10/2014 | A | NR |
Jim Sly
|
|
|
Phone #: ###-#### >> Inspection requested via web by Austin Wagner Called Austin........NR......Need Vapor barrier in crawl, Address #'s and positive drainage away from structure. ( Right now....4" deep water on entire length ...... North side of house.
|
BLD-Energy code compliance | 1/7/2014 | 1/7/2014 | 1/7/2014 | P | PASS |
Jim Sly
|
|
|
Austin Phone #: ###-####
|
BLD-Framing/Rough-in | 1/3/2014 | 1/6/2014 | 1/6/2014 | A | PART |
Jim Storey
|
|
|
AUSTIN Phone #: ###-#### c/n posted ok to insulate.
|
BLD-Wall Bracing | 12/20/2013 | 12/20/2013 | 12/20/2013 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 12/19/2013 | 12/20/2013 | 12/20/2013 | A | PASS |
Dave Hannah
|
|
|
austin - shear inspection Phone #: ###-####
|
BLD-Footing | 11/21/2013 | 11/22/2013 | 11/22/2013 | P | PASS |
Dave Hannah
|
|
|
Heron Phone #: ###-####
|