FIRE-Final Inspection | 3/13/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Craig D. Hanson
|
|
|
|
BLD-Final | 3/13/2014 | 3/14/2014 | 3/14/2014 | P | PASS |
Jim Sly
|
|
|
Final building inspection, please coordinate with Adam for Access and field walk. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
OK for Perm Occ.
|
FIRE-Conference | 3/12/2014 | 3/12/2014 | 3/12/2014 | P | DONE |
Forrest France
|
|
|
On site conference regarding fire life safety inspection items. Noted adjustments to exit sign and fire extinguisher locations.
|
BLD-Ceiling Grid Inspection | 2/24/2014 | 2/25/2014 | 2/25/2014 | A | PART |
Dave Hannah
|
|
|
A10 Capital, West side, ceiling grid inspection request. Contact Adam or Bob for Access. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to flood west half
|
BLD-Framing/Rough-in | 1/31/2014 | 2/3/2014 | 2/3/2014 | A | PASS |
Dave Hannah
|
|
|
A10 Ceiling Grid inspection, 2nd half, East Side. Walk with Bob or Adam. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 1/29/2014 | 1/30/2014 | 1/30/2014 | P | PASS |
Dave Hannah
|
|
|
Framing Soffit Rough in inspection, West 1/2 of 11th floor. Please coordinate with Bob or Adam for walk. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 1/17/2014 | 1/17/2014 | 1/17/2014 | P | PASS |
Dave Hannah
|
|
|
2nd half framing and exterior insulation, A10 capital, 11th floor, requested by Bob. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Framing/Rough-in | 1/13/2014 | 1/13/2014 | 1/14/2014 | P | PART |
Dave Hannah
|
|
|
Framing inspection walk requested by Bob L. PM, 11th Floor A10 Capital. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson ext walls ok to cover
|