Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-03123
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 1100
Project NameA10 Capital - 8th & Main
Customer Number 
ePlanReviewYes
Description
(A10 CAPITAL - 8TH & MAIN BLDG - SUITE 1100) NOTE: This building is fully fire sprinklered for high-rise building provisions. To build out for the first time the entire 13,652 square foot 11th floor of this high-rise building for this tenant. The shell building was constructed under BLD12-01991. This project will occupy the entire 11th story. Work to include: interior nonbearing walls to create office spaces, conference rooms, breakrooms, copy/storage rooms, and office support areas; interior windows, interior doors, suspended acoustical ceilings, suspended gypsum board ceilings, gypsum board ceiling soffits, millwork, and finishes; mechanical, electrical and plumbing work. All work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. NOTE: This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
FIRE-Final Inspection3/13/20143/14/20143/14/2014PPASS
DetailsCraig D. Hanson
BLD-Final3/13/20143/14/20143/14/2014PPASS
DetailsJim Sly
Final building inspection, please coordinate with Adam for Access and field walk. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson

OK for Perm Occ.
FIRE-Conference3/12/20143/12/20143/12/2014PDONE
DetailsForrest France
On site conference regarding fire life safety inspection items. Noted adjustments to exit sign and fire extinguisher locations.
BLD-Ceiling Grid Inspection2/24/20142/25/20142/25/2014APART
DetailsDave Hannah
A10 Capital, West side, ceiling grid inspection request. Contact Adam or Bob for Access. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to flood west half
BLD-Framing/Rough-in1/31/20142/3/20142/3/2014APASS
DetailsDave Hannah
A10 Ceiling Grid inspection, 2nd half, East Side. Walk with Bob or Adam. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in1/29/20141/30/20141/30/2014PPASS
DetailsDave Hannah
Framing Soffit Rough in inspection, West 1/2 of 11th floor. Please coordinate with Bob or Adam for walk. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in1/17/20141/17/20141/17/2014PPASS
DetailsDave Hannah
2nd half framing and exterior insulation, A10 capital, 11th floor, requested by Bob. Thanks. AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in1/13/20141/13/20141/14/2014PPART
DetailsDave Hannah
Framing inspection walk requested by Bob L. PM, 11th Floor A10 Capital. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson ext walls ok to cover