BLD-Conference | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Mike Jordan
|
|
|
Call Matt 30 min prior to arrival. Phone #: ###-#### Inspection requested via web by Chris Laraway
|
DOC - Permit Finaled | 9/18/2014 | 9/18/2014 | 9/18/2014 | P | PASS |
Mike Jordan
|
|
|
CO detector added.
|
BLD-Final | 9/16/2014 | 9/17/2014 | 9/17/2014 | A | FAIL |
Dave Hannah
|
|
|
Call Matt 30 minutes prior to arrival Phone #: ###-#### Inspection requested via web by Chris Laraway needs a co2 detector up stair out side of bedrooms
|
BLD-Wall cover | 6/9/2014 | 6/10/2014 | 6/10/2014 | P | PASS |
Mike Jordan
|
|
|
Call 30 min prior. Inspection is of lower garage area. Upper addition previously inspected. Phone #: ###-#### >> Inspection requested via web by Chris Laraway
|
BLD-Wall cover | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | CANC |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Laraway
|
BLD-Energy code compliance | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Laraway. ok to sheetrock upstairs only.
|
BLD-Framing/Rough-in | 2/20/2014 | 2/21/2014 | 2/21/2014 | A | PART |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Laraway. ok to insulate upstairs only.
|
BLD-Wall Bracing | 1/10/2014 | 1/13/2014 | 1/13/2014 | A | PASS |
Mike Jordan
|
|
|
Chris Phone #: ###-####
|
BLD-Wall Bracing | 1/6/2014 | 1/7/2014 | 1/7/2014 | A | FAIL |
Mike Jordan
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Laraway. Exterior wall bracing, Needs to attach wall bracing areas with 1.75 inch min length, 16ga. staplles spaced at 3" o.c. ar edges and 6" o.c. in field. 1.5 inch staples were used and are overspaced. Correction notice posted.
|
BLD-Footing | 11/15/2013 | 11/15/2013 | 11/15/2013 | A | PASS |
Mike Jordan
|
|
|
Concrete footing by Aeon Concrete -Shawn Phone #: ###-#### >> Inspection requested via web by Chris Laraway
|