FIRE-Final Inspection | 2/13/2014 | 2/13/2014 | 2/13/2014 | P | PASS |
Forrest France
|
|
|
C/N items verified, fire life safety passed.
|
BLD-Final | 2/12/2014 | 2/13/2014 | 2/13/2014 | A | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer perm final ok upon fire sign off.
|
FIRE-Final Inspection | 2/12/2014 | 2/13/2014 | 2/13/2014 | A | FAIL |
Forrest France
|
|
|
Missing EM lighting at the NW exit passageway, missing exit discharge light at the NW exit, new beverage delivery closet will require fire sprinkler coverage, provide signage at the hood suppression manual pull stations. Project related FIR trade permit finals also pending.
|
FIRE-Alarm Testing | 2/12/2014 | 2/13/2014 | 2/13/2014 | A | DONE |
Forrest France
|
|
|
Duplicate inspection request
|
BLD-Final | 2/11/2014 | 2/12/2014 | 2/12/2014 | P | DEFR |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
FIRE-Final Inspection | 2/11/2014 | 2/12/2014 | 2/12/2014 | P | CANC |
Troy Cobbley
|
|
|
There were no notes for the plans and the project related fire suppression permit could not be finaled. Due to other inspection responcibilities I could not waite at the job site any longer. Will need to be rescheduled.
|
FIRE-Alarm Testing | 2/11/2014 | 2/12/2014 | 2/12/2014 | P | CANC |
Troy Cobbley
|
|
|
Life safety, Final fire, Final alarm Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
FIRE-Conference | 2/10/2014 | 2/10/2014 | 2/10/2014 | A | DONE |
Forrest France
|
|
|
On site conference regarding fire life safety items and project related FIR trade permit work.
|
BLD-Ceiling Grid Inspection | 2/4/2014 | 2/5/2014 | 2/5/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 2/3/2014 | 2/4/2014 | 2/4/2014 | A | PASS |
Jim Storey
|
|
|
New bar wall framing Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 1/27/2014 | 1/28/2014 | 1/28/2014 | A | PASS |
Jim Storey
|
|
|
New restroom floor framing Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Footing | 1/27/2014 | 1/28/2014 | 1/28/2014 | A | PASS |
Jim Storey
|
|
|
Slab prep. Concrete onsite at 9:30am Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|
BLD-Framing/Rough-in | 1/21/2014 | 1/21/2014 | 1/21/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: ###-#### >> Inspection requested via web by Chris Palmer
|