Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-03362
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8746 W PINE NUT LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1486 sq. ft., two story (first story 644 sq. ft., second story 842 sq. ft.) single family dwelling with 3 bedrooms, 2.5 bathrooms, approximately 54 sq. ft. of covered patio/porch and a 430 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/6/201411/6/201411/6/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
DOC - Permit Finaled11/6/201411/6/201411/6/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results11/6/201411/6/201411/6/2014PDONE
DetailsMike Jordan
4
BLD-Wall cover4/14/20144/15/20144/15/2014APASS
DetailsMike Jordan
Sheetrock shear fastening schedule Phone #: ###-#### >> Inspection requested via web by Brian Stark. Interior wall bracing ok.
BLD-Energy code compliance4/8/20144/9/20144/9/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Framing/Rough-in4/4/20144/7/20144/7/2014APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall Bracing2/23/20142/24/20142/24/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall Bracing2/10/20142/11/20142/11/2014APASS
DetailsMike Jordan
Shearwall fastening. Call brian prior. Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall Bracing2/3/20142/4/20142/4/2014APART
DetailsMike Jordan
Inspect second floor shear nailing. Available 8-9 am Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd floor exterior walls.
BLD-Conference2/1/20142/3/20142/3/2014ADONE
DetailsMike Jordan
Meet to discuss shear inspection strategy Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Footing1/28/20141/28/20141/28/2014PPASS
DetailsMike Jordan
Chad Phone #: ###-####. Interior thickend footing.
BLD-Energy code compliance1/17/20141/21/20141/21/2014APART
DetailsJim Sly
steve Phone #: ###-####
Foundation.
BLD-Foundation1/13/20141/13/20141/13/2014PPASS
DetailsMike Jordan
Juron Phone #: ###-####
BLD-Conference1/13/20141/13/20141/13/2014PDONE
DetailsMike Jordan
Call and meet with brian regarding firewall question Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Footing1/8/20141/9/20141/9/2014PPART
DetailsMike Jordan
Heron Phone #: ###-####
BLD-Footing1/8/20141/9/20141/9/2014ACANC
DetailsMike Jordan
Please call Jim Phone #: ###-#### >> Inspection requested via web by James Larkin