BLD-Final | 2/26/2014 | 2/26/2014 | 2/27/2014 | P | PASS |
Dave Hannah
|
|
|
Final inspection of basement storage rooms. Coordinate with Adam for Access, Thanks AKJ. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Final | 2/27/2014 | 2/27/2014 | 2/27/2014 | A | PASS |
Dave Hannah
|
|
|
Reinspect basement cooridors, TSE to install exit sign in correct location. Call Adam for access. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|
BLD-Final | 2/25/2014 | 2/25/2014 | 2/26/2014 | P | PEND |
Dave Hannah
|
|
|
Final Inspection of added basement storage rooms, separate permit from shell and core scope of work. Coordinate with Adam for Access, walk thru. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson needs to install exit sign
|
FIRE-Final Inspection | 2/25/2014 | 2/25/2014 | 2/25/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety finaled.
|