Permit Information
Permit NumberBLD13-03484
StatusFinaled
Name ROGER SCHUMACHER
Site Address 209 N 12TH ST
Project NameIdaho First Bank
Customer Number 
ePlanReviewNo
Description
(IDAHO FIRST BANK – Ceiling installation and occupancy permit) Permit to remodel an existing 7,071 square foot bank building. PLAN MODIFICATION 1-3-14 – Modification submitted to permit prefabricated office partitions provided by OEC outside of the permitted scope of work. Partitions to be of all non-combustable material. New doors with accessible hardware will also be added. Structural integrity verified in field by the Building Inspector. **TLW** This building is not fire spinklered. Scope of work includes: installation of new suspended ceiling, installation of new lighting, and interior finishes. This permit will also establish occupancy for a new tenant moving into this building. This building was previously occupied by “Bank of the Cascades”. This building is not fire sprinklered. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final1/8/20141/8/20141/8/2014PPASS
DetailsTony Young
roger - mid-afternoon please Phone #: ###-####
FIRE-Final Inspection1/8/20141/8/20141/8/2014PPASS
DetailsForrest France
Noted correction items verified for completion. Life safety passed.
BLD-Final1/7/20141/8/20141/8/2014APEND
DetailsTony Young
Please call ahead for access/meet - Roger Phone #: ###-####
BLD-Final1/6/20141/7/20141/7/2014PNR
DetailsTony Young
Please call ahead for access/meet - Roger Phone #: ###-####
FIRE-Final Inspection1/6/20141/7/20141/7/2014AFAIL
DetailsForrest France
Final pending installation of exit signs at the second floor level.
FIRE-Final Inspection1/6/20141/7/20141/6/2014APASS
DetailsForrest France
Fire sprinkler permit finaled.
FIRE-Final Inspection1/3/20141/3/20141/3/2014PNR
DetailsForrest France
Pending remainder of C/N items
BLD-Ceiling Grid Inspection12/31/20131/2/20141/2/2014PPART
DetailsTony Young
Please call ahead for access - Roger Phone #: ###-####,, ceiling grid is ok,,, other issues now with added walls/offices on main level,,, correction notice posted to provide info to the plan reviewer
FIRE-Conference12/31/201312/31/201312/31/2013PDONE
DetailsForrest France
On site conference with tenant regarding conditions for occupancy including fire extinguishers, exit signs, EM lights, door hardware and project schedule.
BLD-Ceiling Grid Inspection12/31/201312/31/201312/31/2013PPEND
DetailsTony Young
Please call ahead for access - Roger Phone #: ###-####,, needs elec. pass
BLD-Framing/Rough-in12/27/201312/27/201312/27/2013PPART
DetailsJim Storey
Ceiling Grid insepction please--Roger-Please call prior to inspection Phone #: ###-#### need others to sign off/ primitter clips need instaled