Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD13-03523
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8718 W PINE VALLEY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1340 sq. ft., 3 story (first story 228 sq. ft, second story 552 sq. ft., third story 560 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 90 sq. ft. of covered patio/porch and a 379 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. Approval based on previous approval of this design. R-2D zoning and setbacks per planning. Ajs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/8/20149/8/20149/8/2014PPASS
DetailsMike Jordan
Call brian prior Phone #: ###-#### Inspection requested via web by Brian Stark
DOC - Permit Finaled9/8/20149/8/20149/8/2014PPASS
DetailsMike Jordan
BLD-Blower Door Test Results9/8/20149/8/20149/8/2014PDONE
DetailsMike Jordan
5
BLD-Energy code compliance7/21/20147/22/20147/22/2014APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Framing/Rough-in7/16/20147/16/20147/16/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Wall cover6/16/20146/16/20146/16/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. Firewall completion in roof areas and exterior walls.
BLD-Wall Bracing4/24/20144/24/20144/24/2014PPASS
DetailsMike Jordan
Firewall attachments. Please inspect netween 1 and 2. Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd floor firewall ok.
BLD-Wall Bracing4/23/20144/23/20144/23/2014PPASS
DetailsMike Jordan
Upper wall shear. Please inspect between 12-1 if possible or as soon as possible in afternoon. Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd floor wall bracing ok.
BLD-Wall cover4/18/20144/18/20144/18/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd floor 2hr.wall ok.
BLD-Energy code compliance4/18/20144/18/20144/18/2014PPASS
DetailsMike Jordan
Firewall insulation Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall Bracing4/17/20144/17/20144/17/2014APASS
DetailsMike Jordan
Upper story shear Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd. floor shear nailing ok.
BLD-Energy code compliance4/14/20144/15/20144/15/2014APASS
DetailsMike Jordan
Insulation at firewall Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD-Wall cover4/15/20144/15/20144/15/2014PPASS
DetailsMike Jordan
Insulation at firewall Phone #: ###-#### >> Inspection requested via web by Brian Stark. 1st. floor firewall ok.
BLD-Wall cover4/14/20144/14/20144/14/2014PCANC
DetailsMike Jordan
Firewall Phone #: ###-#### >> Inspection requested via web by Brian Stark Inspection cancelled from web by: Brian Stark
BLD-Footing3/31/20143/31/20143/31/2014APASS
DetailsMike Jordan
Flatwork Phone #: ###-#### >> Inspection requested via web by James Larkin. Interior footing ok.
BLD-Energy code compliance3/21/20143/24/20143/24/2014APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Energy code compliance3/21/20143/21/20143/21/2014PPASS
DetailsMike Jordan
rigid insulation at exterior foundation under slab on grade.
BLD-Foundation3/17/20143/18/20143/18/2014PPASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing3/17/20143/17/20143/17/2014PPART
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin
BLD-Footing3/17/20143/17/20143/17/2014ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin