Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD13-03534
StatusFinaled
Name PARADIGM CONSTRUCTION COMPANY LLC
Site Address 8747 W PINE VALLEY LN
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 1340 sq. ft., 3 story (first story 228 sq. ft, second story 552 sq. ft., third story 560 sq. ft.) Townhouse with 3 bedrooms, 2.5 bathrooms, approximately 90 sq. ft. of covered patio/porch and a 379 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. JG
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final8/19/20148/19/20148/19/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
DOC - Permit Finaled8/19/20148/19/20148/19/2014PPASS
DetailsMike Jordan
BLD-Energy code compliance7/16/20147/16/20147/16/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Wall Bracing7/16/20147/16/20147/16/2014PPASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Framing/Rough-in7/10/20147/11/20147/11/2014APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD-Framing/Rough-in7/8/20147/9/20147/9/2014PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark. Provide additional studs on either side of 2plyin garage to providebearing at end of wall, Also repair bottom plate at this location. Complete all fireblocking Provide 2 layers of 5/8 type x rock at soffits. Install baffels and rulers in attic. Steps in garge are non code compliant.
BLD-Wall Bracing7/9/20147/9/20147/9/2014PFAIL
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Brian Stark. Several areas were sheating is not attached. Correction notice posted.
BLD-Wall cover5/19/20145/20/20145/20/2014APASS
DetailsMike Jordan
Firewall assembly Phone #: ###-#### >> Inspection requested via web by Brian Stark. 3rd story ok.
BLD-Wall cover5/14/20145/15/20145/15/2014APASS
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Brian Stark. 2nd story 2hr. firewall ok.
BLD-Energy code compliance3/14/20143/14/20143/14/2014PPASS
DetailsMike Jordan
BLD-Footing3/11/20143/11/20143/11/2014PPASS
DetailsMike Jordan
BLD-Footing3/10/20143/11/20143/11/2014ANR
DetailsMike Jordan
Juron Phone #: ###-####. Moved to pm.
BLD-Footing3/10/20143/10/20143/10/2014PNR
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by James Larkin. Will reschedule.