Permit Information
Permit NumberBLD13-03581
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 12177 W OVERLAND RD
Project NameCantabria Development
Customer Number 
ePlanReviewNo
Description
(CANTABRIA DEVELOPMENT - BLDG 2) - To construct a new 3,668 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00337 Per Planning and Zoning. See BLD13-03579 for building plan review report. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection2/29/20162/29/20163/1/2016 PASS
DetailsMike Jordan
DOC - Permit Finaled3/1/20163/1/20163/1/2016PPASS
DetailsMike Jordan
BLD-Aging Inspection12/30/201512/30/201512/30/2015 PASS
DetailsMike Jordan
BLD-Aging Inspection10/21/201510/21/201510/21/2015 PASS
DetailsMike Jordan
BLD-Final8/21/20158/24/20158/24/2015APASS
DetailsMike Jordan
Phone #: ###-#### Inspection requested via web by Tyler Hildebrand. Will be ok for perm occ. once zoning signs perm.
BLD-Final8/21/20158/21/20158/21/2015ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Tyler Hildebrand Inspection cancelled from web by: Tyler Hildebrand
FIRE-Final Inspection8/20/20158/20/20158/20/2015PPASS
DetailsJim Page
Life fire safety passed/complete
BLD-Energy code compliance6/9/20156/11/20156/11/2015APASS
DetailsMike Jordan
insulation inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD-Framing/Rough-in6/9/20156/10/20156/10/2015APASS
DetailsMike Jordan
rough in frame Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD-Wall Bracing5/19/20155/19/20155/19/2015PPASS
DetailsMike Jordan
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD-Wall Bracing5/6/20155/6/20155/6/2015PPASS
DetailsMike Jordan
2nd floor interior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD-Wall Bracing4/28/20154/29/20154/29/2015APASS
DetailsMike Jordan
interior shear floor 1 Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD-Energy code compliance4/16/20154/17/20154/17/2015PPASS
DetailsMike Jordan
Vicki Phone #: ###-####
BLD-Foundation4/16/20154/16/20154/16/2015PPASS
DetailsMike Jordan
Manuel Phone #: ###-####
BLD-Footing4/15/20154/15/20154/15/2015PPASS
DetailsMike Jordan
Manuel Phone #: ###-####