Permit Information
Permit NumberBLD13-03591
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 11933 W OVERLAND RD
Project NameCantabria Development
Customer Number 
ePlanReviewNo
Description
(CANTABRIA DEVELOPMENT - BLDG 12) - To construct a new 3,668 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. A "Type A" Accessible unit is located on the 1st story of this unit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00337 Per Planning and Zoning. See BLD13-03579 for building plan review report. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection3/9/20163/9/20163/9/2016 PASS
DetailsMike Jordan
BLD-Aging Inspection12/30/201512/30/201512/30/2015 PASS
DetailsMike Jordan
BLD-Aging Inspection10/19/201510/19/201510/19/2015 PASS
DetailsMike Jordan
BLD-Final6/12/20156/12/20156/12/2015PPART
DetailsMike Jordan
2pm Phone #: ###-#### Inspection requested via web by Tyler Hildebrand. Ok for temp occ. Lower bathroom sink for ada unit and install mirrors in ada unit.
BLD-Final6/11/20156/12/20156/12/2015ACANC
DetailsMike Jordan
Phone #: ###-#### >> Inspection requested via web by Tyler Hildebrand Inspection cancelled from web by: Tyler Hildebrand
BLD-Final6/10/20156/11/20156/11/2015PNR
DetailsMike Jordan
Tyler Phone #: ###-####
FIRE-Final Inspection6/10/20156/11/20156/11/2015APASS
DetailsTroy Cobbley
Life safety passed
BLD-Energy code compliance5/1/20155/4/20155/4/2015APASS
DetailsMike Jordan
insulation inspection Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD-Framing/Rough-in5/1/20155/1/20155/1/2015PPASS
DetailsMike Jordan
rough frame Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD-Framing/Rough-in4/30/20154/30/20154/30/2015PNR
DetailsMike Jordan
rough framing Phone #: ###-#### Inspection requested via web by Mel Rawlinson. Needs to complete airseal and fire sprinkler rough in inspection.
BLD-Wall Bracing4/13/20154/15/20154/15/2015APASS
DetailsMike Jordan
exterior shear Phone #: ###-#### Inspection requested via web by Mel Rawlinson
BLD-Wall Bracing3/19/20153/20/20153/20/2015APASS
DetailsPhil Shearer
Shear // Tyler Phone #: ###-####. 1st floor party wall
BLD-Wall Bracing3/19/20153/19/20153/19/2015PPASS
DetailsMike Jordan
interior sheer 1st floor Phone #: ###-#### Inspection requested via web by Tyler Hildebrand
BLD-Other3/13/20153/16/20153/16/2015ADEFR
DetailsMike Jordan
Interior footings - Ken Phone #: ###-####
BLD-Energy code compliance3/10/20153/10/20153/10/2015APASS
DetailsMike Jordan
Vicky Phone #: ###-####. rigid insulation on interior side of foundation wall under SOG.
BLD-Foundation3/5/20153/5/20153/5/2015PPASS
DetailsJim Sly
Manuel Phone #: ###-####
BLD-Footing3/4/20153/4/20153/4/2015PPASS
DetailsDave Hannah
Manuel Phone #: ###-####