Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberBLD14-00148
StatusFinaled
Name ARMADA HOMES
Site Address 1153 E INSIGNIA DR
Project Name 
Customer Number 
ePlanReviewNo
Description
Permit for the construction of a new 2718 sq. ft., two story (first story 968 sq. ft., second story 1750 sq. ft.) single family dwelling with 4 bedrooms, 2.5 bathrooms, approximately 258 sq. ft. of covered patio/porch and a 634 sq. ft. attached garage per the approved plans, Rescheck, plan review report and any notations. R-2D zoning and setbacks per planning. JG A letter from the applicant’s geotechnical engineer indicating that the footing/column subgrade is acceptable must be approved by Public Works prior to scheduling a footing inspection. Call Jason Taylor at 384-3946

Prior to obtaining a final for the permit, the roof storm drainage system must be inspected by Public Works. Call Jason Taylor at 384-3946.

Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final2/11/20152/11/20152/11/2015PPASS
DetailsPhil Shearer
. Phone #: ###-#### Inspection requested via web by Kelly Stover
DOC - Permit Finaled2/11/20152/11/20152/11/2015PPASS
DetailsPhil Shearer
BLD-Energy code compliance10/31/201411/3/201411/3/2014PPASS
DetailsJim Storey
Kelly Phone #: ###-####
BLD-Framing/Rough-in10/31/201411/3/201411/3/2014PPASS
DetailsJim Storey
Kelly Phone #: ###-####
BLD-Framing/Rough-in10/29/201410/30/201410/30/2014AFAIL
DetailsJim Storey
Kelly Phone #: ###-#### ok to insulate
BLD-Wall Bracing10/15/201410/15/201410/15/2014PPASS
DetailsPhil Shearer
Kelly Phone #: ###-####
BLD-Wall Bracing10/14/201410/15/201410/15/2014ANR
DetailsPhil Shearer
Shear Inspection Phone #: ###-#### Inspection requested via web by Kelly Stover
BLD-Foundation9/8/20149/9/20149/9/2014APASS
DetailsDave Hannah
Matt Phone #: ###-####
BLD-Foundation9/5/20149/8/20149/8/2014PNR
DetailsTony Young
Matt Phone #: ###-####,, work in progress but not ready
BLD-Foundation9/4/20149/5/20149/5/2014PNR
DetailsJim Storey
Matt Phone #: ###-####
BLD-Footing9/2/20149/3/20149/3/2014APASS
DetailsJim Storey
8:30 appt. 301
BLD-Footing9/2/20149/2/20149/2/2014PDEFR
DetailsJim Storey
matt Phone #: ###-####