Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberBLD14-00212
StatusFinaled
Name ANDERSEN CONSTRUCTION CO
Site Address 10746 W FLORENCE DR
Project NameCordillera Development
Customer Number 
ePlanReviewYes
Description
(CORDILLERA DEVELOPMENT - BLDG 10) To construct a new 3,668 sq. ft., two story, Four unit, apartment building. Units 'A' have one bedroom, one den, and two bathrooms. Units 'B' have two bedrooms, and two bathrooms. All 4 dwelling units have their own independent exit. All construction per the approved plans, attached plan review report, and all other reviewing agencies approvals. One hour fire-partition separations are required between dwelling units. This building is required to be fire sprinklered. The fire sprinkler system shall be per NFPA 13R as regulated by the fire department. DRH13-00288 Per Planning and Zoning. See BLD14-00203 for Building Plan Review Report. **SRZ**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final4/9/20154/9/20154/9/2015PPASS
DetailsMike Jordan
Dave Phone #: ###-####
BLD-Aging Inspection1/27/20151/27/20151/27/2015 PASS
DetailsMike Jordan
BLD-Final10/21/201410/22/201410/22/2014APART
DetailsMike Jordan
Danny Phone #: ###-####. ok for temp occ. Ok for temp occ. provide additional layer of 5/8 type x on lid and complete fire caulking in riser room.
FIRE-Final Inspection10/20/201410/21/201410/21/2014APASS
DetailsCraig D. Hanson
BLD-Energy code compliance9/4/20149/5/20149/5/2014APASS
DetailsMike Jordan
Richard Phone #: ###-####
BLD-Framing/Rough-in9/4/20149/5/20149/5/2014APASS
DetailsMike Jordan
Richard Phone #: ###-####
BLD-Framing/Rough-in9/4/20149/4/20149/4/2014PNR
DetailsMike Jordan
BLD-Framing/Rough-in9/3/20149/4/20149/4/2014AFAIL
DetailsMike Jordan
Richard Phone #: ###-####. Seal all penetrations in draft stop, strap top plate 1st.floor, in b unit at pvc pipes. Provide the correct headers in the a units by stairs, remove the rim board and reattach floor joist, provide roll blocking in a units at trusses above main entry doors. Provide the 4x4 posts with required connectors at base and top of post in A units.
BLD-Wall Bracing8/15/20148/15/20148/15/2014PPASS
DetailsMike Jordan
Richard Phone #: ###-####. exterior floor to floor straps ok.
BLD-Wall Bracing8/14/20148/14/20148/14/2014PFAIL
DetailsMike Jordan
Richard Phone #: ###-####. Exterior floor to floor straps, all not installed.
BLD-Wall Bracing8/1/20148/1/20148/1/2014PPASS
DetailsJim Storey
Richard-strap Phone #: ###-####
BLD-Wall Bracing7/24/20147/24/20147/24/2014PPASS
DetailsMike Jordan
2nd fl wall shear - Richard Phone #: ###-####. remainder of exterior walls 2nd floor ok.
BLD-Wall Bracing7/23/20147/23/20147/23/2014PPASS
DetailsMike Jordan
Richard-shear & strap Phone #: ###-####. !st. floor exterior shear walls ok, 1st. floor interior shear walls ok. 2nd. floor exterior shear walls ok.
BLD-Wall Bracing7/21/20147/22/20147/22/2014APASS
DetailsMike Jordan
Ken Scaggs Phone #: ###-####. Interior shear walls 1st. floor ok.
BLD-Wall Bracing7/21/20147/21/20147/21/2014PNR
DetailsMike Jordan
Ken Phone #: ###-####
BLD-Energy code compliance6/25/20146/26/20146/26/2014PPASS
DetailsMike Jordan
Ashley Phone #: ###-####. Rigid insulation at stemwaal under slab on grade ok.
BLD-Foundation6/24/20146/24/20146/24/2014PPASS
DetailsMike Jordan
Manual Phone #: ###-####
BLD-Footing6/23/20146/24/20146/24/2014APASS
DetailsMike Jordan
Dave Phone #: ###-####