BLD-Final | 6/19/2014 | 6/20/2014 | 6/20/2014 | A | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. All isssues resolved. Ok for perm occ.
|
BLD-Final | 6/19/2014 | 6/19/2014 | 6/19/2014 | P | FAIL |
Mike Jordan
|
|
|
jim Phone #: ###-####. Remove the exit sign from non operational door and hardware.
|
BLD-Final | 6/18/2014 | 6/18/2014 | 6/18/2014 | P | NR |
Mike Jordan
|
|
|
Phone #: ###-####. Needs mech. final.
|
FIRE-Final Inspection | 6/16/2014 | 6/16/2014 | 6/16/2014 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed. Contractor to provide correct address and the push/pull hardware for the island restroom door prior to a building final
|
BLD-Framing/Rough-in | 5/1/2014 | 5/2/2014 | 5/2/2014 | A | PASS |
Mike Jordan
|
|
|
jim Phone #: ###-####. ok to cover.
|
BLD-Framing/Rough-in | 5/1/2014 | 5/1/2014 | 5/1/2014 | P | PART |
Mike Jordan
|
|
|
jim Phone #: ###-####. No approved plans on site. reviewed plan that was on site and inspected the interior non bearing steel stud walls. ok to on side and insulate only. Contractor to call another framing inspection for friday in the am and will review approved plans prior to cover.
|