BLD-Final | 3/19/2014 | 3/19/2014 | 3/19/2014 | P | PASS |
Mike Jordan
|
|
|
John Sears Phone #: ###-####. ok for perm occ.
|
BLD-Foundation | 3/19/2014 | 3/19/2014 | 3/19/2014 | P | CANC |
Mike Jordan
|
|
|
John Sears Phone #: ###-####
|
BLD-Final | 3/11/2014 | 3/12/2014 | 3/12/2014 | A | NR |
Mike Jordan
|
|
|
JOHN Phone #: ###-####. Spoke to John, noted that he has revised floor plan and engineering for testing rack. Will resubmit to plan review for approval.
|
BLD-Final | 3/5/2014 | 3/6/2014 | 3/7/2014 | P | PART |
Mike Jordan
|
|
|
john Phone #: ###-####. ok for temp occ. Needs to resubmit matching floor plan, provide engineering for tube steel testing rack. Also noted that an electrical permit may be required for equipment that is hardwired in. Contacted Jonhn Sears and leftmessage. waiting for call back.
|
FIRE-Final Inspection | 3/5/2014 | 3/6/2014 | 3/6/2014 | A | PASS |
Troy Cobbley
|
|
|
Life safety passed. The revised floor plans still has not been resubmitted to plan review.
|
BLD-Final | 3/5/2014 | 3/5/2014 | 3/5/2014 | A | NR |
Mike Jordan
|
|
|
Needs fire/life/safety.
|
BLD-Final | 3/4/2014 | 3/5/2014 | 3/5/2014 | A | PEND |
Mike Jordan
|
|
|
john Phone #: ###-#### (This activity was added in error so we have changed the case status back to Issued.)
|
DOC - Permit Finaled | 3/5/2014 | 3/5/2014 | 3/5/2014 | P | PASS |
Mike Jordan
|
|
|
repairs have been inspected. This portion of the work is completed.
|
BLD-Final | 2/19/2014 | 2/20/2014 | 2/20/2014 | P | NR |
Mike Jordan
|
|
|
in the AM o.k. or before 2pm // John Phone #: ###-####. Fire/life/safety failed.
|
FIRE-Final Inspection | 2/19/2014 | 2/20/2014 | 2/20/2014 | A | FAIL |
Troy Cobbley
|
|
|
Provide fire extinguishers as discussed, provide missing exit signs in the warehouse, provide emergency lighting through-out, provide single action hardware on the exit doors as marked provide sprinkler system analasis and verification repairs have been completed, contact plan review about floor plan not matching.
|