BLD-Final | 3/24/2016 | 3/24/2016 | 3/24/2016 | A | DONE |
Bob Archibald
|
|
|
|
DOC - Permit Finaled | | | 3/24/2016 | | DONE |
|
|
|
|
BLD-Conference | 3/18/2016 | 3/18/2016 | 3/21/2016 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Other | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | CANC |
Dave Hannah
|
|
|
Final for electrical, plumbing, public works Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Final | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall Bracing | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Foundation | 6/10/2015 | 6/11/2015 | 6/11/2015 | A | CANC |
Dave Hannah
|
|
|
Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Wall cover | 3/24/2015 | 3/25/2015 | 3/25/2015 | A | PASS |
Dave Hannah
|
|
|
Podium level tower 1 unit soffits Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 10/15/2014 | 10/17/2014 | 10/17/2014 | P | CANC |
Jim Storey
|
|
|
Parapet framing at tower one Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Conference | 10/14/2014 | 10/15/2014 | 10/15/2014 | P | PASS |
Jim Storey
|
|
|
Conference on UL listing and fire wrapping wood members. Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 10/9/2014 | 10/13/2014 | 10/13/2014 | A | PASS |
Jim Storey
|
|
|
Roof sheathing north half of tower one Phone #: ###-#### Inspection requested via web by Tim Toups roof sheer nail ok to grid 11 west side of building.
|
BLD-Framing/Rough-in | 10/9/2014 | 10/10/2014 | 10/10/2014 | P | PART |
Jim Storey
|
|
|
South half of tower one roof sheathing. Phone #: ###-#### Inspection requested via web by Tim Toups first roof diaphrams south to north ok to roof up to 3rd not onspected
|
BLD-Conference | 10/9/2014 | 10/10/2014 | 10/9/2014 | P | CANC |
Jim Storey
|
|
|
Roof sheathing south half of tower one Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
|
BLD-Framing/Rough-in | 10/9/2014 | 10/9/2014 | 10/9/2014 | P | CANC |
Jim Storey
|
|
|
Roof sheathing south half of tower one Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
|
BLD-Framing/Rough-in | 10/3/2014 | 10/3/2014 | 10/3/2014 | P | PASS |
Jim Storey
|
|
|
Ext. shear panel at tower 1, 2nd floor Phone #: ###-#### Inspection requested via web by Tim Toups as noted
|
BLD-Conference | 10/2/2014 | 10/3/2014 | 10/3/2014 | A | NR |
Jim Storey
|
|
|
Ext. shear panel at tower 1, 2nd floor Phone #: ###-#### Inspection requested via web by Tim Toups
|
BLD-Framing/Rough-in | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Jim Storey
|
|
|
Request for wall framing partial at the Podium level. Phone #: ###-#### Inspection requested via web by Tim Toups sheer area 2 2nd floor ok to ri trades
|
BLD-Concrete | 5/20/2014 | 5/21/2014 | 5/21/2014 | A | PASS |
Jim Storey
|
|
|
BLD-COM/RES INSPECTOR reviewed fire stopping
|
BLD-Conference | 5/6/2014 | 5/7/2014 | 5/7/2014 | A | PART |
Jim Storey
|
|
|
9:00 appt w/carl review of landings handrails lower 3 locations 2 ramps and elevator
|
BLD-Footing | 3/31/2014 | 4/1/2014 | 4/1/2014 | P | PART |
Jim Storey
|
|
|
Concrete Column and Shear wall placement scheduled for 2:00pm. Requesting for a rebar inspection prior to placement. Thank you, Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
|
BLD-Footing | 3/20/2014 | 3/21/2014 | 3/21/2014 | P | PASS |
Jim Storey
|
|
|
Request for a rebar visual for concrete columns and footings. Concrete is scheduled for 2pm. Prior visit would be appreciated. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin si on site
|
BLD-Conference | 3/12/2014 | 3/13/2014 | 3/13/2014 | P | PASS |
Jim Storey
|
|
|
Inspection request for two separate conditions. Column concrete placement at 12:30am and rebar reinforcement for footings scheduled for placement at 2:00pm. Thank you. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
|
BLD-Conference | 3/11/2014 | 3/12/2014 | 3/12/2014 | P | PASS |
Jim Storey
|
|
|
Inspection request for 1:00pm to inspect the structural rebar for spread footings along grid lines 7 and 8 and columns along grid line 13. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
|
BLD-Footing | 3/10/2014 | 3/11/2014 | 3/11/2014 | P | PASS |
Jim Storey
|
|
|
Inspection requested for today around 1pm.
|
BLD-Conference | 3/10/2014 | 3/10/2014 | 3/10/2014 | P | CANC |
Jim Storey
|
|
|
Inspection requested for today around 1pm. Rebar inspection for concrete column reinforcing at grid lines 14 and 15.
Thank you. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
|
BLD-Conference | 3/5/2014 | 3/6/2014 | 3/6/2014 | P | PART |
Jim Storey
|
|
|
Rebar inspection for spread footings along grid lines 9 and 10. Concrete scheduled for 2pm. A 1 pm rebar inspection will be acceptable. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin insp. by si pending report.
|
BLD-Other | 3/4/2014 | 3/5/2014 | 3/5/2014 | P | PASS |
Jim Storey
|
|
|
rebar/placement at 2- Carl Phone #: ###-####
|
BLD-Footing | 3/4/2014 | 3/4/2014 | 3/4/2014 | P | PASS |
Jim Storey
|
|
|
Phone #: 2088595251 >> Inspection requested via mobile web by Mike Koci
|
BLD-Footing | 2/28/2014 | 3/3/2014 | 3/3/2014 | P | PASS |
Jim Storey
|
|
|
rebar - mike Phone #: ###-#### si on site ok
|
BLD-Footing | 2/26/2014 | 2/27/2014 | 2/27/2014 | A | PASS |
Jim Storey
|
|
|
Mike Koci Phone #: ###-#### si on site// ft 14 15, xx 1
|