Information based on query as of Wednesday, June 26, 2024.
Permit Information
Permit NumberBLD14-00377
StatusFinaled
Name ESI
Site Address 1011 S LA POINTE ST
Project NameBoise Heights Apartments
Customer Number 
ePlanReviewNo
Description
(BOISE HEIGHTS APARTMENTS - 1ST STORY) Fire sprinklers used for building area increase. To construct the footings, foundations, shear walls, slab on grade, and 3-hr fire-resistance-rated post tensioned slab (i.e. 1st story only) for a 5 story garage and residential apartment building (one story garage at grade and 4 stories of residential apartments above). The rest of the building will be done under permit BLD13-03405. This is an early start permit. All work is required to comply with the drawings yet to be approved under permit BLD13-03405. The garage and adjacent areas will have a total floor area of about 72,725 square feet and will be of Type I-A construction. An office area will also be located on the 1st story next to the garage and will have a floor area of about 2,448 square feet. It will be of Type V-A construction and will be separated from the garage by a 3-hr fire wall. A 3-hr horizontal assembly (i.e. a post tensioned concrete slab) will separate the garage from the apartment building above. Required special inspections include soils, concrete reinforcing steel including prestressing tendons, concrete, welding, masonry, and other activities as listed on the structural drawings. The work is required to comply with the approved drawings, with all plan reviews, with the structural design, and with all applicable codes and ordinances. This permit is NOT intended to establish a Certificate of Occupancy. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final3/24/20163/24/20163/24/2016ADONE
DetailsBob Archibald
DOC - Permit Finaled  3/24/2016 DONE
BLD-Conference3/18/20163/18/20163/21/2016PPASS
DetailsDave Hannah
BLD-Other6/10/20156/11/20156/11/2015ACANC
DetailsDave Hannah
Final for electrical, plumbing, public works Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Final6/10/20156/11/20156/11/2015ACANC
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Framing/Rough-in6/10/20156/11/20156/11/2015ACANC
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Wall Bracing6/10/20156/11/20156/11/2015ACANC
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Foundation6/10/20156/11/20156/11/2015ACANC
DetailsDave Hannah
Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Wall cover3/24/20153/25/20153/25/2015APASS
DetailsDave Hannah
Podium level tower 1 unit soffits Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Framing/Rough-in10/15/201410/17/201410/17/2014PCANC
DetailsJim Storey
Parapet framing at tower one Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Conference10/14/201410/15/201410/15/2014PPASS
DetailsJim Storey
Conference on UL listing and fire wrapping wood members. Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Framing/Rough-in10/9/201410/13/201410/13/2014APASS
DetailsJim Storey
Roof sheathing north half of tower one Phone #: ###-#### Inspection requested via web by Tim Toups roof sheer nail ok to grid 11 west side of building.
BLD-Framing/Rough-in10/9/201410/10/201410/10/2014PPART
DetailsJim Storey
South half of tower one roof sheathing. Phone #: ###-#### Inspection requested via web by Tim Toups first roof diaphrams south to north ok to roof up to 3rd not onspected
BLD-Conference10/9/201410/10/201410/9/2014PCANC
DetailsJim Storey
Roof sheathing south half of tower one Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
BLD-Framing/Rough-in10/9/201410/9/201410/9/2014PCANC
DetailsJim Storey
Roof sheathing south half of tower one Phone #: ###-#### >> Inspection requested via web by Tim Toups Inspection cancelled from web by: Tim Toups
BLD-Framing/Rough-in10/3/201410/3/201410/3/2014PPASS
DetailsJim Storey
Ext. shear panel at tower 1, 2nd floor Phone #: ###-#### Inspection requested via web by Tim Toups as noted
BLD-Conference10/2/201410/3/201410/3/2014ANR
DetailsJim Storey
Ext. shear panel at tower 1, 2nd floor Phone #: ###-#### Inspection requested via web by Tim Toups
BLD-Framing/Rough-in9/8/20149/9/20149/9/2014APASS
DetailsJim Storey
Request for wall framing partial at the Podium level. Phone #: ###-#### Inspection requested via web by Tim Toups sheer area 2 2nd floor ok to ri trades
BLD-Concrete5/20/20145/21/20145/21/2014APASS
DetailsJim Storey
BLD-COM/RES INSPECTOR reviewed fire stopping
BLD-Conference5/6/20145/7/20145/7/2014APART
DetailsJim Storey
9:00 appt w/carl review of landings handrails lower 3 locations 2 ramps and elevator
BLD-Footing3/31/20144/1/20144/1/2014PPART
DetailsJim Storey
Concrete Column and Shear wall placement scheduled for 2:00pm. Requesting for a rebar inspection prior to placement. Thank you, Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
BLD-Footing3/20/20143/21/20143/21/2014PPASS
DetailsJim Storey
Request for a rebar visual for concrete columns and footings. Concrete is scheduled for 2pm. Prior visit would be appreciated. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin si on site
BLD-Conference3/12/20143/13/20143/13/2014PPASS
DetailsJim Storey
Inspection request for two separate conditions. Column concrete placement at 12:30am and rebar reinforcement for footings scheduled for placement at 2:00pm. Thank you. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
BLD-Conference3/11/20143/12/20143/12/2014PPASS
DetailsJim Storey
Inspection request for 1:00pm to inspect the structural rebar for spread footings along grid lines 7 and 8 and columns along grid line 13. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
BLD-Footing3/10/20143/11/20143/11/2014PPASS
DetailsJim Storey
Inspection requested for today around 1pm.
BLD-Conference3/10/20143/10/20143/10/2014PCANC
DetailsJim Storey
Inspection requested for today around 1pm. Rebar inspection for concrete column reinforcing at grid lines 14 and 15.

Thank you. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin
BLD-Conference3/5/20143/6/20143/6/2014PPART
DetailsJim Storey
Rebar inspection for spread footings along grid lines 9 and 10. Concrete scheduled for 2pm. A 1 pm rebar inspection will be acceptable. Phone #: ###-#### >> Inspection requested via web by Carl Benjamin insp. by si pending report.
BLD-Other3/4/20143/5/20143/5/2014PPASS
DetailsJim Storey
rebar/placement at 2- Carl Phone #: ###-####
BLD-Footing3/4/20143/4/20143/4/2014PPASS
DetailsJim Storey
Phone #: 2088595251 >> Inspection requested via mobile web by Mike Koci
BLD-Footing2/28/20143/3/20143/3/2014PPASS
DetailsJim Storey
rebar - mike Phone #: ###-#### si on site ok
BLD-Footing2/26/20142/27/20142/27/2014APASS
DetailsJim Storey
Mike Koci Phone #: ###-#### si on site// ft 14 15, xx 1