BLD-Final | 5/5/2014 | 5/6/2014 | 5/6/2014 | A | PASS |
Jim Sly
|
|
|
boyd - first thing in the morning please Phone #: ###-#### OK for Perm Occ.
|
BLD-Final | 4/21/2014 | 4/22/2014 | 4/22/2014 | A | NR |
Mike Jordan
|
|
|
Boydd Phone #: ###-####. Needs plumbing final.
|
FIRE-Final Inspection | 4/21/2014 | 4/21/2014 | 4/21/2014 | P | PASS |
Troy Cobbley
|
|
|
life safety passed. Contractor to remove the thumbturn lock and the manual flush bolts from the inactive leaf and provide automatic flush bolts prior to the building inspection.
|
BLD-Framing/Rough-in | 4/3/2014 | 4/4/2014 | 4/4/2014 | A | PASS |
Mike Jordan
|
|
|
early as poss // Boyd Phone #: ###-####. Interior steel stud framed walls ok.
|