Permit Number | BLD14-00550 |
Status | Issued |
Name |
DIAMOND CONTRACTORS LLC
|
Site Address |
106 N 6TH ST
|
Project Name | Old Boise Streetscapes 2014 |
Customer Number | |
ePlanReview | Yes |
Description |
(OLD BOISE STREETSCAPES) This portion of the 2014 Streetscape work is for the replacement of structural slabs to support the new sidewalk over existing vaults. Work to include: Strengthen the existing sidewalk framing system with structural slabs that will occur atop existing basement vaults that are below the sidewalks and In-fill sidewalk vaults with retaining walls. The sidewalk structure is of structural suspended slab, slab on grade, and steel beams. The retaining walls are of poured-in-place reinforced concrete. All work per the approved plans, Engineering, and applicable adopted codes. SPECIAL INSPECTIONS ARE REQUIERD. See Statement of Special Inspections Application #310 attached to the plans. DRH14-00020 per Planning and Zoning. A certificate of completion shall be issued when work is completed and a final inspection has occurred. **SRZ**
|