BLD-Conference | 9/29/2014 | 10/1/2014 | 10/1/2014 | A | CANC |
Phil Shearer
|
|
|
call 1 hr. ahead // Scott Martin Phone #: ###-####
|
BLD-Conference | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | FAIL |
Phil Shearer
|
|
|
Floor plan did not match layout. (wall added ramp removed). doorway into fitness room needs a landing on both sides of the door.CN posted
|
BLD-Conference | 10/1/2014 | 10/1/2014 | 10/1/2014 | P | DONE |
Mike Jordan
|
|
|
|
BLD-Final | 9/12/2014 | 9/15/2014 | 9/15/2014 | P | CANC |
Phil Shearer
|
|
|
Chad-please call with and est. time so he can meet you and let you in Phone #: ###-####
|
FIRE-Final Inspection | 9/12/2014 | 9/15/2014 | 9/15/2014 | A | FAIL |
Forrest France
|
|
|
Items noted include; reverse door hardware at the NW storage closet, extension cords are not to be used as a substitute for permanent power to appliances, repair gap at rated door to the second exit, threshold and overhead clearance at the exit doors from the assembly area are not compliant (missing ramp), post max occupancy sign per review note #9, sutie address does not match permit documents.
|