BLD-Final | 9/22/2014 | 9/23/2014 | 9/23/2014 | A | PASS |
Phil Shearer
|
|
|
Gari Phone #: ###-####
|
DOC - Permit Finaled | 9/23/2014 | 9/23/2014 | 9/23/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Final | 9/16/2014 | 9/17/2014 | 9/17/2014 | P | FAIL |
Phil Shearer
|
|
|
Please call ahead for access 30min - Gari Phone #: ###-####
|
BLD-Framing/Rough-in | 8/7/2014 | 8/8/2014 | 8/8/2014 | A | CANC |
Phil Shearer
|
|
|
deck framing inspection please--Jim Phone #: ###-#### Deck Framing ok
|
BLD-Framing/Rough-in | 8/7/2014 | 8/7/2014 | 8/7/2014 | P | CANC |
Phil Shearer
|
|
|
Jim Phone #: ###-####
|
BLD-Final | 7/31/2014 | 8/1/2014 | 8/1/2014 | P | PART |
Phil Shearer
|
|
|
PLease call 30min ahead for access - Gari Phone #: ###-#### Interior of the house passes structural inspection. Full final is pending electrical final and the completion off the two balconys.
|
BLD-Final | 7/25/2014 | 7/29/2014 | 7/30/2014 | P | FAIL |
Phil Shearer
|
|
|
Gari-Please call at least 30 mins in advance Phone #: ###-#### CN written
|
BLD-Footing | 7/2/2014 | 7/2/2014 | 7/2/2014 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Foundation | 6/24/2014 | 6/25/2014 | 6/25/2014 | A | FAIL |
Dave Hannah
|
|
|
Jim Phone #: ###-#### needs aproved plans for deck and geo tech on soils
|
BLD-Energy code compliance | 5/7/2014 | 5/8/2014 | 5/8/2014 | P | PASS |
Dave Hannah
|
|
|
Jim Phone #: ###-####
|
BLD-Framing/Rough-in | 5/6/2014 | 5/7/2014 | 5/8/2014 | A | PART |
Dave Hannah
|
|
|
jim Phone #: ###-#### ok to insulate but need engineering on header back wall 12ft span
|
BLD-Energy code compliance | 5/6/2014 | 5/7/2014 | 5/8/2014 | A | PART |
Dave Hannah
|
|
|
jim Phone #: ###-#### seal package ok
|