BLD-Final | 1/27/2016 | 1/28/2016 | 1/28/2016 | P | PASS |
Phil Shearer
|
|
|
Blare-please call for meet time would early pm Phone #: ###-####
|
FIRE-Final Inspection | 5/20/2015 | 5/21/2015 | 5/21/2015 | P | PASS |
Troy Cobbley
|
|
|
Life safety passed
|
BLD-Final | 5/15/2015 | 5/18/2015 | 5/18/2015 | P | NR |
Phil Shearer
|
|
|
Call with results - Blair Phone #: ###-####
|
FIRE-Final Inspection | 5/15/2015 | 5/18/2015 | 5/18/2015 | A | FAIL |
Troy Cobbley
|
|
|
Fire hydrant installed, portable fire extinguisher still not installed in pavalion per city approved plans.
|
BLD-Final | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | CANC |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
FIRE-Final Inspection | 3/5/2015 | 3/6/2015 | 3/6/2015 | A | FAIL |
Forrest France
|
|
|
Items needed prior to final include; post missing fire extinguisher at location indicated per plan, new hydrant per plan sheet G1.0 is not yet installed. Refer to project fire code review notes for details.
|
BLD-Framing/Rough-in | 1/9/2015 | 1/12/2015 | 1/12/2015 | P | PASS |
Phil Shearer
|
|
|
Chris Phone #: ###-####
|
BLD-Foundation | 1/9/2015 | 1/9/2015 | 1/9/2015 | P | PASS |
Phil Shearer
|
|
|
Chris-grout work under columns Phone #: ###-####
|
BLD-Footing | 11/7/2014 | 11/7/2014 | 11/7/2014 | P | PASS |
Phil Shearer
|
|
|
|
BLD-Footing | 11/6/2014 | 11/7/2014 | 11/7/2014 | A | NR |
Phil Shearer
|
|
|
Blair// would like inspection after 9am if possible// pour time 11:30 Phone #: ###-####
|