BLD-Final | 6/6/2014 | 6/6/2014 | 6/6/2014 | P | PASS |
Jim Sly
|
|
|
Please call ahead 30min - Elliott Phone #: ###-#### OK for Perm Occ.
|
FIRE-Final Inspection | 6/6/2014 | 6/6/2014 | 6/6/2014 | P | PASS |
Troy Cobbley
|
|
|
life safety passed
|
BLD-Final | 4/30/2014 | 5/1/2014 | 5/1/2014 | A | PART |
Jim Sly
|
|
|
Elliot-pleae call for access Phone #: ###-#### OK for Temp Occ.....OK for Perm OCC when Fire perms and verification of doors/windows/hardware OK (not installed at this time).
|
FIRE-Final Inspection | 4/30/2014 | 5/1/2014 | 5/1/2014 | A | PART |
Troy Cobbley
|
|
|
Temporary occupancy given with Romeo's permission until the fire sprinkler modifications have been completed.
|
FIRE-Conference | 4/22/2014 | 4/23/2014 | 4/23/2014 | P | DONE |
Forrest France
|
|
|
On site conference regarding remodel work and modifications needed to maintain fire sprinkler coverage. Also discussed additional exit signage and emergency lighting (annotated locations on plans), door hardware, fire extinguisher placement, etc.
|
BLD-Framing/Rough-in | 4/22/2014 | 4/23/2014 | 4/23/2014 | P | PASS |
Tom Arcoraci
|
|
|
Elliott-please call 30 minutes prior for access Phone #: ###-####
|