(BISHOP KELLY HIGH SCHOOL – Library Addition/Renovation) Permit to add an addition of 4,787 square feet to the center of the building by expanding the library into the existing interior court. This building is sprinklered for allowable area increase. Work is to include: construction of new foundation and exterior shell, [construction of interior non-bearing walls to create a reading and print room], installation of new accessible doors / hardware, new electrical, new mechanical and interior finishes. NOTE: This building is fire sprinklered for area increase. This building is fully Fire Sprinklered with an approved Fire Alarm system. Any alterations or modifications to the buildings Fire Sprinkler or Fire Alarm system WILL REQUIRE A SEPARATE PERMIT and shall be installed per NFPA 13 & NFPA 72 as regulated by the Boise Fire Department. **TLW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/14/201411/17/201411/17/2014PPASS
DetailsPhil Shearer
ross - call prior to going to meet Phone #: ###-####
BLD-Final11/6/201411/7/201411/7/2014APART
DetailsPhil Shearer
Ross Phone #: ###-####. OK for TCO
FIRE-Final Inspection11/4/201411/6/201411/6/2014PPASS
DetailsForrest France
Fire life safety inspection completed satisfactory.
Code Occupancy Approval  11/3/2014 DONE
BLD-Final9/22/20149/22/20149/22/2014ACANC
DetailsPhil Shearer
Ross Phone #: ###-####
BLD-Energy code compliance9/5/20149/8/20149/9/2014PPASS
DetailsPhil Shearer
Ross Phone #: ###-####
BLD-Framing/Rough-in9/4/20149/5/20149/5/2014PPASS
DetailsPhil Shearer
Ross Phone #: ###-####
BLD-Framing/Rough-in8/25/20148/25/20148/26/2014PNR
DetailsPhil Shearer
Ross Phone #: ###-####
BLD-Framing/Rough-in8/11/20148/12/20148/12/2014ACANC
DetailsPhil Shearer
Rock Phone #: ###-####
BLD-Wall cover8/11/20148/12/20148/12/2014ACANC
DetailsPhil Shearer
Rock Phone #: ###-####
BLD-Wall Bracing8/12/20148/12/20148/12/2014PPART
DetailsPhil Shearer
Rock Phone #: ###-####
Still need to install hold downs. OK to cover exterior
BLD-Framing/Rough-in7/11/20147/14/20147/14/2014APASS
DetailsJim Storey
Ross Phone #: ###-#### roof framing ok to cover// 2hr wall framing ok need to verify firestopping.