BLD-Final | 8/17/2015 | 8/18/2015 | 8/18/2015 | A | PASS |
Dave Hannah
|
|
|
please call ahead for access, 20 minutes - Mike Phone #: ###-####
|
DOC - Permit Finaled | 8/18/2015 | 8/18/2015 | 8/18/2015 | P | PASS |
Dave Hannah
|
|
|
|
BLD-Conference | 8/12/2015 | 8/13/2015 | 8/13/2015 | P | DONE |
Dave Hannah
|
|
|
Michael Phone #: ###-####
|
BLD-Wall cover | 1/9/2015 | 1/13/2015 | 1/14/2015 | P | PASS |
Jim Sly
|
|
|
late afternoon // David Phone #: ###-#### Frame And Energy pass
|
BLD-Wall cover | 1/2/2015 | 1/5/2015 | 1/5/2015 | P | CANC |
Dave Hannah
|
|
|
Michael property owner called to cancele. not ready 1-5-15 blh // David Phone #: ###-####
|
BLD-Framing/Rough-in | 12/5/2014 | 12/8/2014 | 12/9/2014 | P | PASS |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Framing/Rough-in | 11/12/2014 | 11/14/2014 | 11/14/2014 | P | CANC |
Dave Hannah
|
|
|
David Phone #: ###-####
|
BLD-Conference | 11/4/2014 | 11/6/2014 | 11/7/2014 | P | DONE |
Dave Hannah
|
|
|
David-may possibly need frame inspection as well-please call with an est. time so he can meet Phone #: ###-####
|
BLD-Framing/Rough-in | 10/21/2014 | 10/23/2014 | 10/23/2014 | P | NR |
Phil Shearer
|
|
|
call before to meet // David Phone #: ###-#### No plans onsite.
|
BLD-Footing | 5/13/2014 | 5/14/2014 | 5/14/2014 | A | PASS |
Dave Hannah
|
|
|
Jerry Phone #: ###-####
|