Information based on query as of Friday, June 28, 2024.
Permit Information
Permit NumberBLD14-01012
StatusFinaled
Name ESI
Site Address 800 W MAIN ST Unit: 1400
Project NameDeloitte Office Space
Customer Number 
ePlanReviewYes
Description
(DELOITTE - SUITE 1400) Fire sprinklers used for high rise. To create a 6,605 square foot office tenant space on the 18,300 square foot 14th story of a new high rise building. Work is to include interior nonbearing walls, interior doors and sidelights, card readers, suspended acoustical ceilings, millwork, and finishes. The work is required to comply with the approved drawings, with the plan review report, and with all applicable codes and ordinances. The fire sprinkler system is required to comply with NFPA 13 and the fire alarm system is required to comply with NFPA 72 as regulated by the Fire Department. **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Aging Inspection10/13/201410/13/201410/20/2014 PASS
DetailsDave Hannah
BLD-Final10/20/201410/20/201410/20/2014PPASS
DetailsDave Hannah
Adam-pleae call prior for access Phone #: ###-####
BLD-Final8/8/20148/11/20148/11/2014APART
DetailsDave Hannah
Request for final building inspection. Please contact Adam for access and walk. Thanks. akj Phone #: ###-#### Inspection requested via web by Adam Johnson ok for temp occ needs to install doors and side lights
BLD-Final8/11/20148/11/20148/11/2014PCANC
DetailsDave Hannah
Final Inspection of Deloitte TI, 14th Floor, Please call Adam or Bob. Thanks, AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Final8/8/20148/8/20148/8/2014PCANC
DetailsDave Hannah
Request for final building inspection. Please contact Adam for access and walk. Thanks. akj Phone #: ###-#### >> Inspection requested via web by Adam Johnson
FIRE-Final Inspection8/8/20148/8/20148/8/2014PPASS
DetailsForrest France
Fire life safety approved pending the addition of one missing exit sign at the north open office area, missing doors throughout. Items to be finished prior to structural final.
BLD-Ceiling Grid Inspection7/31/20148/1/20148/1/2014APASS
DetailsDave Hannah
Request for ceiling inspection, coordinate with Bob or Adam for access to 14th floor. Thanks, AKJ ###-#### Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in6/18/20146/19/20146/19/2014APASS
DetailsDave Hannah
2nd half of 14th Floor framing inspection, requested per Bob. L. ESI. Call with any access needs. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Conference6/13/20146/13/20146/13/2014PPASS
DetailsDave Hannah
Framing inspection of Deloitte space, please contact Adam with any questions. Thanks akj. Phone #: ###-#### >> Inspection requested via web by Adam Johnson
BLD-Framing/Rough-in6/6/20146/9/20146/9/2014APART
DetailsDave Hannah
Top out framing, approve for cover, Monday AM. No subs will be working AM shift due to Noise, contact Bob L, ###-####. with any concerns. Thanks AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson ok to sheetrock top of walls