BLD-Final | 12/3/2014 | 12/4/2014 | 12/4/2014 | A | PASS |
Dave Hannah
|
|
|
Morgan-Owner will have sign off sheet Phone #: ###-####
|
BLD-Final | 11/28/2014 | 11/28/2014 | 11/28/2014 | A | PART |
Jim Storey
|
|
|
chuck ###-####temp ok pending hardware and pw temp.
|
BLD-Final | 11/24/2014 | 11/25/2014 | 11/25/2014 | A | FAIL |
Jim Storey
|
|
|
Chuch Phone #: ###-#### door hardware/ canopy framing aproval no insp.
|
FIRE-Final Inspection | 11/21/2014 | 11/24/2014 | 11/24/2014 | A | PASS |
Forrest France
|
|
|
Life safety passed provided door hardware at the second exit is revised to meet IBC requirements. To be done prior to structural final.
|
BLD-Energy code compliance | 9/4/2014 | 9/4/2014 | 9/4/2014 | P | PASS |
Jim Storey
|
|
|
Chuck Phone #: ###-####
|
BLD-Framing/Rough-in | 8/29/2014 | 9/2/2014 | 9/2/2014 | A | PASS |
Jim Storey
|
|
|
Morgan or ###-#### Chuck-would like as early as possible Phone #: ###-####
|
BLD-Wall Bracing | 8/20/2014 | 8/21/2014 | 8/21/2014 | P | PASS |
Jim Storey
|
|
|
Chuck Phone #: ###-#### ok to cover exterior and interior at cooler areas
|
BLD-Foundation | 7/24/2014 | 7/24/2014 | 7/24/2014 | P | PASS |
Jim Storey
|
|
|
Steve-would like around one if possible-pour time approx 3:00 Phone #: ###-#### ft for canopy ok
|
BLD-Foundation | 6/30/2014 | 7/1/2014 | 7/1/2014 | P | PASS |
Jim Storey
|
|
|
Chuck Phone #: ###-####
|
BLD-Footing | 6/25/2014 | 6/26/2014 | 6/26/2014 | A | PASS |
Jim Storey
|
|
|
Steve-as early am as possible please Phone #: ###-####
|