BLD-Final | 6/25/2014 | 6/26/2014 | 6/26/2014 | A | PASS |
Dave Hannah
|
|
|
Ben Phone #: ###-####
|
FIRE-Final Inspection | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | PASS |
Forrest France
|
|
|
Fire life safety inspection passed.
|
BLD-Final | 6/20/2014 | 6/20/2014 | 6/20/2014 | P | PART |
Dave Hannah
|
|
|
Ben Phone #: ###-#### ok for temp occ- per Dave Hannah no Mechanical required 6-20-14
|
FIRE-Final Inspection | 6/18/2014 | 6/19/2014 | 6/19/2014 | P | PART |
Forrest France
|
|
|
Final pending project related fire sprinkler permit, missing glass at storefront, finishes, etc.
|
BLD-Framing/Rough-in | 6/2/2014 | 6/3/2014 | 6/3/2014 | A | PASS |
Dave Hannah
|
|
|
Ben-AS EARLY AS POSSIBLE PLEASE Phone #: ###-####
|
FIRE-Conference | 5/28/2014 | 5/29/2014 | 5/29/2014 | A | DONE |
Forrest France
|
|
|
On site conference regarding new and existing exit sign locations.
|